<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Transbay Center</title>
	<atom:link href="http://transbaycenter.org/feed" rel="self" type="application/rss+xml" />
	<link>http://transbaycenter.org</link>
	<description></description>
	<lastBuildDate>Thu, 01 Nov 2012 06:00:00 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Glazing Design-Build</title>
		<link>http://transbaycenter.org/rfp/glazing-design-build</link>
		<comments>http://transbaycenter.org/rfp/glazing-design-build#comments</comments>
		<pubDate>Thu, 01 Nov 2012 06:00:00 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5185</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG08.1


Bid Title:
Glazing Design/Build Construction Services


Bid Due Date SUSPENDED:
Bid Date Suspended to Fall of 2012 (formerly January 11, 2012)


Time Due:
2:00 p.m.


Estimated Cost:
in excess of $40,000,000


SBE Requirement:
20%



Description:
The scope of work for the Design/Build Glazing Systems Package includes all glazing systems currently labeled in the bidding documents as W-1, W-3, W-4, W-8, and W-10.  Major scope elements [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG08.1</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Glazing Design/Build Construction Services</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date SUSPENDED:</td>
<td>Bid Date Suspended to Fall of 2012 (formerly January 11, 2012)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>2:00 p.m.</td>
</tr>
<tr>
<td style="text-align: right;">Estimated Cost:</td>
<td>in excess of $40,000,000</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>20%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
The scope of work for the Design/Build Glazing Systems Package includes all glazing systems currently labeled in the bidding documents as W-1, W-3, W-4, W-8, and W-10.  Major scope elements for this package will consist of, but are not limited to, the following:</p>
<ul>
<li>Perform services including the preparation of glazing system design documents, engineered calculations, and detailed coordination shop drawings with associated 2-D &amp; 3-D modeling. Trade Subcontractor to provide coordination, constructability reviews and sequence of installation advice to assist Architect in finalizing the construction documents where glazing systems interface with other aspects of the building (i.e., structural steel, security systems, lighting, etc.).  The process shall be collaborative where all members of the design and contracting team mutually refine and update their respective construction documents to illustrate the full design intent.</li>
<li>Provide all calculations including the verification of blast requirements as specified in the Contract Documents.  Provide all necessary system component and supporting data for testing criteria and all specified test results from blast analysis.</li>
<li>Engineer, prepare, coordinate, conduct and complete all specified on- and off-site testing and mock-ups.</li>
<li>Coordinate all other trade scope system interfaces with W systems (i.e., future fixtures, LEDs, security, signs, etc.) as shown and specified in the Contract Documents.</li>
<li>Fabricate and install all systems and system structures (i.e., all structural and support assemblies that are welded and/or bolted to primary building structure, etc.). Bolted assemblies and their location on primary structures require additional coordination with steel fabricators in conjunction with continuous on- and off-site quality control, shop drawings review and coordination, review and confirmation of all of bolted assemblies including, but not limited to, on-site coordination during fabrication at fabricator facilities.</li>
<li>Furnish and install all specific glazing assemblies and components per bidding documents, including but not limited to all required frit patterns, laminate(s) types, edge treatment, tempering, gaskets and sealants.</li>
<li>Furnish and install all associated aluminum and stainless steel panels, enclosures, escutcheons, trim profiles and any/all aluminum and stainless steel flashing, closure plates and backing assemblies as shown for each W system. All paneling and trims at floor finish levels require coordination with finish floor assemblies and locations. Coordination of receiving trims adjacent to finish flooring requires properly sized and fabricated receiving trims, panels and caps.  </li>
<li>Furnish and install all system expansion joints and subassemblies where specified; all bird deterrent systems; all smoke seals and fire safeing at slab edges; all architectural, structural and fire caulking at joint locations, to adjacent surfaces and to all dissimilar materials where shown and/or specified and by code; vapor barriers; specified protective coatings; welded or bolted plate assemblies to structural steel and/or embedded in concrete and all miscellaneous iron in direct support of glazing systems.</li>
<li>Furnish and install all waterproofing and associated backing plates and support assemblies as specified. All waterproofing assemblies require detailed, systematic coordination and scheduling for proper sequencing of other trades and waterproofing applications. Installation requires multiple mobilizations and non-sequential installations for areas where detailed system interface requires multiple trades to work in tandem in achieving required installations.     </li>
<li>Coordinate and provide support structures requiring interface with other trades (i.e., future lighting, signage, exit signage, etc.).</li>
<li>Design, provide and install all associated system embeds including, but not limited to, field layout, verification of control, grouting and all necessary concrete pour watch manpower.</li>
<li>Coordinate, design and install integral fall protection components for W-8 and W-10 systems only.</li>
</ul>
<p>The selection process for this package has been a three-step process:  1. Request for Qualifications, 2. Request for Design Proposals, and 3. Invitation for Bids.  Trade Subcontractors must be pre-qualified through the first two steps in order to submit a Bid.  Pre-qualified bidders are:</p>
<ul>
<li>Enclos Corp.</li>
<li>Josef Gartner USA (division of Permasteelisa North America Corp.)</li>
<li>NEC of California, Inc., dba Mero/NEC</li>
</ul>
<p>Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A mandatory (for Bidders, not subcontractors to Bidders) pre-bid conference was held on June 21, 2011 at 1:00 pm at TJPA offices, 201 Mission Street, Suite 2100, San Francisco, CA.  The pre-bid conference was followed by an SBE networking session.  An additional SBE networking session was held on June 22. <a href="http://transbaycenter.org/uploads/2011/09/TG08_1_IFB_Pre_Bid_Presentation.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/09/TG08_1_IFB_Pre_Bid_Presentation_Signins.pdf">Pre-Bid Sign-in Sheets</a> | <a href="http://transbaycenter.org/uploads/2011/09/TG08_1_IFB_SBE_Networking_Signins.pdf">SBE Networking Sessions Sign-in Sheets</a></p>
<p>If Webcor/Obayashi Joint Venture chooses to recommend any of the qualified subcontractors for the Glazing Design-Build contract to the TJPA for its approval, the Subcontractor will be required to comply with all TJPA contract requirements.   Trade Subcontractors bidding for the Glazing Design-Build package will be required to have second-tier subcontractors in order to meet a Small Business Enterprise (SBE) participation goal of 20 percent.  SBE is defined in the TJPA <a href="http://transbaycenter.org/uploads/2009/07/SBE_Policy_No_015_Rev1.pdf">Small Business Enterprise Program</a>.  <em><a href="http://transbaycenter.org/uploads/2009/07/DBE-SBE-Fact-Sheet.pdf">Learn more about the TJPA SBE Program.</a></em></p>
<p><strong><em>Questions on Bid Documents has been extended to 2:00 pm on August 5, 2011.</em></strong></p>
<p><strong><em>Bid Due Date has been Suspended to Fall 2012.</em></strong></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2012/10/TG08-1_IFB_Addendum_04.pdf">IFB Addendum #4</a> (Addendum #4 SUSPENDS the Bid Date to Fall 2012)</td>
<td>46KB .pdf</td>
<td>01/06/12</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_Addendum_03.pdf">IFB Addendum #3</a> (Addendum #3 SUSPENDS the Bid Date to January 11, 2012 at 2:00 pm)</td>
<td>109KB .pdf</td>
<td>10/17/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_Addendum_02.pdf">IFB Addendum #2</a> (Documents noted below as Rev C are updated in Addendum #2; revised plans/specs available from Ford Graphics)</td>
<td>72KB .pdf</td>
<td>9/9/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/10/TG08-1_IFB_Addendum_01.pdf">IFB Addendum #1</a> (Documents noted below as Rev B are updated in Addendum #1; revised plans/specs available from Ford Graphics)</td>
<td>158KB .pdf</td>
<td>7/25/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_QA_3.pdf">IFB Questions and Answers #3</a></td>
<td>8108KB .pdf</td>
<td>8/23/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08_1_QandA_2.pdf">IFB Questions and Answers #2</a></td>
<td>491KB .pdf</td>
<td>7/25/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08_1_QandA.pdf">IFB Questions and Answers #1</a></td>
<td>73KB .pdf</td>
<td>7/1/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_IFB_Cover.pdf">Invitation for Bids Cover Letter </a></td>
<td>100KB .pdf</td>
<td>6/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_ExhibitA_Addendum_02.pdf">Invitation for Bids Exhibit A</a> (Rev C)</td>
<td>197KB .pdf</td>
<td>9/9/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_Subcontract_ExhibitsB-X_Add02.pdf">Invitation for Bids Subcontract and Exhibits B-X</a> (Rev C)</td>
<td>8934KB .pdf</td>
<td>9/9/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_IFB_BidManual.pdf">Invitation for Bids Project Bidding Manual</a></td>
<td>240KB .pdf</td>
<td>6/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_IFB_Advert.pdf">Invitation for Bids Advertisement</a></td>
<td>43KB .pdf</td>
<td>6/3/11</td>
</tr>
</tbody>
</table>
<p> </p>
<table border="1" width="85%">
<tbody>
<tr>
<td width="75%"><strong>Qualification/Proposal Documents</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_4_Cover-_and_Narrative.pdf">RFDP Addendum #4</a></td>
<td>38KB .pdf</td>
<td>3/31/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_3_Cover-_and_Narrative.pdf">RFDP Addendum #3</a></td>
<td>70KB .pdf</td>
<td>1/14/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_2.pdf">RFDP Addendum #2</a></td>
<td>94KB .pdf</td>
<td>1/14/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_Addendum1.pdf">RFDP Addendum #1</a></td>
<td>576KB .pdf</td>
<td>12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_Pre-Design_Presentation1.pdf">RFDP Pre-Proposal Presentation</a></td>
<td>1393KB .pdf</td>
<td>11/18/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_Pre-Proposal_Signins.pdf">RFDP Pre-Proposal Sign-in Sheet</a></td>
<td>965KB .pdf</td>
<td>11/18/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_3_ExhibitA.pdf">Glazing Design-Build RFDP</a> (Rev D)</td>
<td>118KB .pdf</td>
<td>1/14/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-01_RFDP_Advertisement.pdf">RFDP Advertisement</a></td>
<td>16KB .pdf</td>
<td>11/12/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_RFQ.pdf">Glazing Design-Build RFQ</a></td>
<td>186KB .pdf</td>
<td>10/4/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_RFQ_Advertisement.pdf">RFQ Advertisement</a></td>
<td>13KB .pdf</td>
<td>10/4/10</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/glazing-design-build/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CAC Meeting – Tuesday, February 14, 2012</title>
		<link>http://transbaycenter.org/calendar-items/cac-meeting-%e2%80%93-tuesday-february-14-2012</link>
		<comments>http://transbaycenter.org/calendar-items/cac-meeting-%e2%80%93-tuesday-february-14-2012#comments</comments>
		<pubDate>Wed, 15 Feb 2012 00:30:47 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7824</guid>
		<description><![CDATA[5:30 pm&#124; TJPA Offices&#124; 201 Mission Street, Suite 2100&#124; San Francisco, CA 94105]]></description>
			<content:encoded><![CDATA[<p><em>Please check back for an agenda, which will be posted approximately 72 hours prior to the meeting date.</em> </p>
<p>Tuesday, February 14, 2011<br />
5:30 pm<br />
TJPA Offices<br />
201 Mission Street,<br />
Suite 2100 San Francisco, CA 94105</p>
<p>5:30 pm| TJPA Offices| 201 Mission Street, Suite 2100| San Francisco, CA 94105</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/cac-meeting-%e2%80%93-tuesday-february-14-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Board Meeting &#8211; February 9, 2012</title>
		<link>http://transbaycenter.org/calendar-items/board-meeting-february-9-2012</link>
		<comments>http://transbaycenter.org/calendar-items/board-meeting-february-9-2012#comments</comments>
		<pubDate>Thu, 09 Feb 2012 19:00:34 +0000</pubDate>
		<dc:creator>ngonzales</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7793</guid>
		<description><![CDATA[9:30am &#124; City Hall, Room 416 &#124; 1 Dr. Carlton B. Goodlett Place &#124; San Francisco, CA 94102]]></description>
			<content:encoded><![CDATA[<p><em>Please check back for an agenda which will be posted at least 72 hours in advance of the meeting.</em></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/board-meeting-february-9-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, February 3, 2012 – Sunday, February 12, 2012</title>
		<link>http://transbaycenter.org/updates/friday-february-3-2012-%e2%80%93-sunday-february-12-2012</link>
		<comments>http://transbaycenter.org/updates/friday-february-3-2012-%e2%80%93-sunday-february-12-2012#comments</comments>
		<pubDate>Sat, 04 Feb 2012 01:23:56 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7835</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/x5vKOt ">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-february-3-2012-%e2%80%93-sunday-february-12-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Community Meeting – February 1, 2011: Transbay Construction Activities</title>
		<link>http://transbaycenter.org/calendar-items/community-meeting-%e2%80%93-february-1-2011-transbay-construction-activities</link>
		<comments>http://transbaycenter.org/calendar-items/community-meeting-%e2%80%93-february-1-2011-transbay-construction-activities#comments</comments>
		<pubDate>Wed, 01 Feb 2012 19:00:12 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7820</guid>
		<description><![CDATA[12:00 pm &#124; TJPA Offices &#124; 201 Mission Street, Suite 2100 &#124; San Francisco, CA 94105]]></description>
			<content:encoded><![CDATA[<h2>Community Meeting: Transbay Construction Activities</h2>
<p>Join us on Wednesday, February 1, 2012 to learn more about construction activities, buttress and shoring wall construction, trestle bridges, street closures and hours of activity. The community meeting will be held from 12:00 noon until 1:00 PM. The meeting will be held at the TJPA’s offices located at 201 Mission Street, Suite 2100. We appreciate that you are taking your lunch hour to learn more about this exciting project, and would of course welcome you to bring food or drinks to this meeting.</p>
<p>
<h3>What:</h3>
<p> Community Meeting: Transbay Construction Update</p>
<p>
<h3>When:</h3>
<p>Wednesday, February 1, 2012 </p>
<p>
<h3>Time:</h3>
<p> 12:00 Noon</p>
<p>
<h3>Where:</h3>
<p> Transbay Joint Powers Authority<br />
201 Mission Street, Suite 2100<br />
San Francisco, CA 94105</p>
<p>We look forward to your participation and input during this exciting time. Click for more information about the <a href="http://transbaycenter.org/project/program-overview">Transbay Transit Center Project</a> or to sign up to <a href="http://transbaycenter.org/receive-updates/join-mailing-list">receive construction updates</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/community-meeting-%e2%80%93-february-1-2011-transbay-construction-activities/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, January 27, 2012 &#8211; Sunday, February 5, 2012</title>
		<link>http://transbaycenter.org/updates/friday-january-27-2012-sunday-february-5-2012</link>
		<comments>http://transbaycenter.org/updates/friday-january-27-2012-sunday-february-5-2012#comments</comments>
		<pubDate>Sat, 28 Jan 2012 00:41:28 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7826</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/ymO8VL ">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-january-27-2012-sunday-february-5-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, January 20, 2012 – Sunday, January 29, 2012</title>
		<link>http://transbaycenter.org/updates/friday-january-20-2012-%e2%80%93-sunday-january-29-2012</link>
		<comments>http://transbaycenter.org/updates/friday-january-20-2012-%e2%80%93-sunday-january-29-2012#comments</comments>
		<pubDate>Sat, 21 Jan 2012 01:22:40 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7818</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/ADarEd">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-january-20-2012-%e2%80%93-sunday-january-29-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, January 13, 2012 &#8211; Sunday, January 22, 2012</title>
		<link>http://transbaycenter.org/updates/friday-january-13-2012-sunday-january-22-2012</link>
		<comments>http://transbaycenter.org/updates/friday-january-13-2012-sunday-january-22-2012#comments</comments>
		<pubDate>Sat, 14 Jan 2012 01:14:37 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7784</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/wQyRL6">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-january-13-2012-sunday-january-22-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing</title>
		<link>http://transbaycenter.org/rfp/structural-concrete-substructure-waterproofing-geothermal-mechanical-electrical-and-plumbing</link>
		<comments>http://transbaycenter.org/rfp/structural-concrete-substructure-waterproofing-geothermal-mechanical-electrical-and-plumbing#comments</comments>
		<pubDate>Thu, 12 Jan 2012 21:00:39 +0000</pubDate>
		<dc:creator>ephillips</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7477</guid>
		<description><![CDATA[REQUEST FOR QUALIFICATIONS TG06:  STRUCTURAL CONCRETE SUBSTRUCTURE, WATERPROOFING, GEOTHERMAL,
MECHNICAL, ELECTRICAL AND PLUMBINGCONSTRUCTION SERVICES 
Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) from Trade Subcontractors interested in bidding the Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing Construction Services on the contract for the Transbay Transit Center (TTC) Project located in [...]]]></description>
			<content:encoded><![CDATA[<p align="center"><strong>REQUEST FOR QUALIFICATIONS <strong>TG06</strong>:  </strong><strong>STRUCTURAL CONCRETE SUBSTRUCTURE, WATERPROOFING, GEOTHERMAL,<br />
MECHNICAL, ELECTRICAL AND PLUMBING</strong><strong>CONSTRUCTION SERVICES</strong><strong> </strong></p>
<p>Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) from Trade Subcontractors interested in bidding the Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California.</p>
<p>Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with structural concrete foundations, reinforcement, embedded items, substructure construction, below-grade waterproofing, geothermal systems, mechanical, electrical, and plumbing infrastructure on complex projects which present significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade:  Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing</p>
<p>Trade Subcontractors will be required to have second-tier subcontractors in order to meet the Transbay Joint Powers Authority’s (TJPA’s) Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) participation goals; these Second-tier subcontractors who will be involved with these requirements do not need to respond to this RFQ.  </p>
<p>If Webcor/Obayashi Joint Venture chooses to recommend any of the Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing contract work to the TJPA for its approval, the Trade Subcontractor will be asked to comply with all TJPA contract requirements.</p>
<p>Contract documents, including plans and specifications, for the project are anticipated to be available for bidding in March 2012. The estimated date for issuing the Notice to Proceed (NTP) for construction is June 2012.  </p>
<p>Trade Subcontractors shall submit and will be evaluated on information with respect to their experience on projects of similar size, scope and complexity.  The information shall include general and specific experience, claim and surety history, financials, ability to meet schedule and budget requirements and skills in general management and coordination.  Resumes of key personnel who will manage and supervise the construction shall be provided in the RFQ response.</p>
<p>Trade Subcontractors must hold valid contractor licenses and must provide ability to obtain corporate surety (payment &amp; performance) bonds and insurance in order to be eligible for the qualification (RFQ) evaluation.  Starting November 9, 2011, RFQ packages will be available from Webcor/Obayashi Joint Venture and from the TJPA.  Interested Subcontractors should download the RFQ directly from this webpage (below); or contact Webcor/Obayashi Joint Venture by e-mail at <a href="mailto:TransbayBidding@webcor-obayashi.com">TransbayBidding@webcor-obayashi.com</a>, or fax at (510) 748-7805 to obtain a package.</p>
<p>Trade Subcontractors shall submit one (1) original and four (4) copies of their RFQ responses by 2:00 p.m. on January 12, 2012, to Jeff Heath, Webcor/Obayashi Joint Venture, located at 175 Beale Street, San Francisco, CA  94105.</p>
<p>Webcor/Obayashi Joint Venture at its own discretion may conduct interviews with any or all of the Subcontractors responding to this RFQ to better determine their qualifications to perform work required under the project. </p>
<p>The evaluation of the RFQ is solely for the purpose of determining Trade Subcontractors who would be deemed qualified to bid for and perform the work outlined in the RFQ. </p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2012/01/TG06-RFQ-QA-111215.pdf">Questions and Answers on RFQ Document</a></td>
<td>65KB .pdf</td>
<td>Posted 12/15/11</td>
</tr>
<tr>
<td><a href="http://bit.ly/snx8V4">Request for Qualifications TG06</a></td>
<td>241KB .pdf</td>
<td>11/9/2011</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG06_RFQ_Advertisement.pdf">TG06 Advertisement</a></td>
<td>20KB .pdf</td>
<td>11/9/2011</td>
</tr>
</tbody>
</table>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFQ Dates</strong></td>
</tr>
<tr>
<td>RFQ Issued</td>
<td>Wednesday, November 9, 2011</td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>By Thursday, December 8, 2011, 2:00 pm</td>
</tr>
<tr>
<td>RFQ Packages Due</td>
<td>Thursday, January 12, 2012, 2:00 pm</td>
</tr>
<tr>
<td>Qualification Notifications to Trade Subcontractors</td>
<td>Thursday, February 16, 2012</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/structural-concrete-substructure-waterproofing-geothermal-mechanical-electrical-and-plumbing/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Board Meeting &#8211; January 12, 2012</title>
		<link>http://transbaycenter.org/calendar-items/board-meeting-january-12-2012</link>
		<comments>http://transbaycenter.org/calendar-items/board-meeting-january-12-2012#comments</comments>
		<pubDate>Thu, 12 Jan 2012 19:00:27 +0000</pubDate>
		<dc:creator>ngonzales</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7720</guid>
		<description><![CDATA[9:30am &#124; City Hall, Room 416 &#124; 1 Dr. Carlton B. Goodlett Place &#124; San Francisco, CA 94102]]></description>
			<content:encoded><![CDATA[<p style="text-align: center;"><strong>TRANSBAY JOINT POWERS AUTHORITY<br />
BOARD OF DIRECTORS</strong></p>
<p align="center"><strong> </strong></p>
<p align="center"><strong>NOTICE OF MEETING AND CALENDAR</strong> </p>
<p> </p>
<p align="center">Thursday, January 12, 2012<br />
1 Dr. Carlton B. Goodlett Place, Room 416<br />
San Francisco, CA </p>
<p align="center"> </p>
<p align="center">REGULAR MEETING<br />
9:30 a.m. </p>
<p align="center"> </p>
<p align="center">BOARD OF DIRECTORS</p>
<p align="center">Jane Kim, Chair<br />
    Elsa Ortiz, Vice Chair<br />
Art Lloyd<br />
Gabriel Metcalf<br />
Edward Reiskin<br />
Bijan Sartipi </p>
<p> </p>
<p align="center">Executive Director<br />
Maria Ayerdi-Kaplan</p>
<p align="center">  </p>
<p align="center">Secretary<br />
Nila Gonzales<br />
 </p>
<p> </p>
<p align="center">201 Mission St. #2100<br />
San Francisco, California  94105<br />
415-597-4620<br />
415-597-4615 fax</p>
<p> </p>
<p> </p>
<p align="center">ACCESSIBLE MEETING POLICY</p>
<p>The Transbay Joint Powers Authority meeting will be held in Room 416, at 1 Dr. Carlton B. Goodlett Place, San Francisco, CA.  The closest accessible BART station is the Civic Center Station at United Nations Plaza and Market Street.  Accessible MUNI lines serving this location are:  Muni Metro Lines J‑Church, K‑Ingleside, L‑Taraval, M‑Oceanview, N‑Judah, and T-Third at Van Ness and Civic Center Stations; F-Market; 19-Polk, 47‑Van Ness; 49-Mission-Van Ness; 5-Fulton; 6 Parnassus; 21-Hayes; 9‑San Bruno; and 71‑Haight Noriega.  For more information about MUNI services call 311. </p>
<p>The meeting room is wheelchair accessible.  Accessible curbside parking spaces have been designated on the Van Ness Avenue and McAllister Street perimeters of City Hall for mobility-impaired persons.  There is accessible parking available within the Civic Center Underground Parking Garage at the corner of McAllister and Polk Streets, and within the Performing Arts Parking Garage at Grove and Franklin Streets. </p>
<p>If you require the use of an American Sign Language interpreter, a sound enhancement system, or a reader during the meeting, such person or system can be made available upon request; please contact Nila Gonzales at (415) 597-4620 or <a href="mailto:NGonzales@TransbayCenter.org">NGonzales@TransbayCenter.org</a>, at least 72 hours prior to the meeting.  Late requests will be honored if possible.  Calendars and minutes of the meeting may be available in alternative formats; please contact Nila Gonzales at (415) 597-4620 or <a href="mailto:NGonzales@TransbayCenter.org">NGonzales@TransbayCenter.org</a> at least 72 hours in advance of need.  Written reports or background materials for calendar items are available for public inspection and copying at 201 Mission St. Suite 2100 during regular business hours and are available online at <a href="http://www.transbaycenter.org/">www.TransbayCenter.org</a>. </p>
<p>To assist the City’s efforts to accommodate persons with severe allergies, environmental illness, multiple chemical sensitivity or related disabilities, attendees at public meetings are reminded that other attendees may be sensitive to various chemical based products.  Please help the City to accommodate these individuals. </p>
<p>The ringing and use of cell phones, pagers and similar sound-producing electronic devices are prohibited at this meeting.  Please be advised that the Chair may order the removal from the meeting room of any person(s) responsible for the ringing or use of a cell phone, pager, or other similar sound-producing electronic devices. </p>
<p> </p>
<p> </p>
<p>9:30 – REGULAR MEETING</p>
<p align="center">ORDER OF BUSINESS</p>
<p>1.  Call to Order</p>
<p>2.  Roll Call</p>
<p>3.  Communications</p>
<p>4.  Board of Director’s New and Old Business</p>
<p>5.  Executive Director’s <a href="http://transbaycenter.org/uploads/2012/01/ED-Report_State-of-Program-2012.pdf" target="_blank">Report</a></p>
<ul>
<li>Construction <a href="http://transbaycenter.org/uploads/2012/01/ED-Report_Construction-Update-1-12-12.pdf" target="_blank">Update</a></li>
</ul>
<p>6.  Public Comment </p>
<p>    Members of the public may address the Authority on matters that are within the Authority&#8217;s<br />
    jurisdiction and are not on today&#8217;s calendar.</p>
<p>THE FOLLOWING MATTERS BEFORE THE TRANSBAY JOINT POWERS AUTHORITY ARE RECOMMENDED FOR ACTION AS STATED BY THE EXECUTIVE DIRECTOR OR THE CHAIR.<br />
 </p>
<p align="center">REGULAR CALENDAR</p>
<p>7.  <a href="http://transbaycenter.org/uploads/2012/01/Item7_Excavation-Plan-and-Temp-Bridge-Trestle-Design.pdf" target="_blank">Presentation </a>of Transbay Transit Center Building Excavation Plan and Temporary Bridge and Trestle Design.</p>
<p>8.  Approving the Minutes of the <a href="http://transbaycenter.org/uploads/2012/01/12-8-11_Minutes.pdf" target="_blank">December 8, 2011</a> meeting.<br />
 </p>
<p>ADJOURN </p>
<p> </p>
<p>The Ethics Commission of the City and County of San Francisco has asked us to remind individuals that influence or attempt to influence local legislative or administrative action may be required by the San Francisco Lobbyist Ordinance [Campaign and Gov't Conduct Code, Article II, Chapter 1, § 2.100, et seq.] to register and report lobbying activity.  For more information about the Lobbyist Ordinance, please contact the Ethics Commission at 25 Van Ness Avenue, Suite 220, San Francisco, CA 94102, telephone (415) 252-3100, fax (415) 252-3124 and web site: www.sfethics.org.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/board-meeting-january-12-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Construction Management Services for Bus Storage Facility</title>
		<link>http://transbaycenter.org/rfp/construction-management-services-for-bus-storage-facility</link>
		<comments>http://transbaycenter.org/rfp/construction-management-services-for-bus-storage-facility#comments</comments>
		<pubDate>Wed, 11 Jan 2012 22:00:00 +0000</pubDate>
		<dc:creator>ephillips</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7453</guid>
		<description><![CDATA[Request for Proposals for Construction Management Services
The Transbay Joint Powers Authority (TJPA) is issuing a Request for Proposals (RFP) for CONSTRUCTION MANAGEMENT SERVICES FOR BUS STORAGE STORAGE FACILITY from firms with expertise in the construction management of similar facilities.
The Bus Storage facility will be located beneath the I-80 approach to the Bay Bridge within the [...]]]></description>
			<content:encoded><![CDATA[<h1><span id="MainContentBlock"><strong>Request for Proposals for Construction Management Services</strong></span></h1>
<p>The Transbay Joint Powers Authority (TJPA) is issuing a Request for Proposals (RFP) for CONSTRUCTION MANAGEMENT SERVICES FOR BUS STORAGE STORAGE FACILITY from firms with expertise in the construction management of similar facilities.</p>
<p>The Bus Storage facility will be located beneath the I-80 approach to the Bay Bridge within the block bounded by Second, Third, Stillman, and Perry streets, and will be used for weekday, mid-day bus storage for approximately 49 buses.  The Project includes a significant amount of soil excavation and off-haul in order to facilitate construction of an at-grade parking facility for mid-day storage of transit buses, sound walls, retaining walls, fences/gates, security/access control systems, administration and support facilities, and a bus link ramp spanning over Second Street to connect with the new Bus Ramps to be constructed under a separate contract. </p>
<p>An outreach event was held on November 8, 2011 at the Transbay Joint Powers Authority offices.  The sign in sheets and presentation are posted below.<br />
<a href="http://transbaycenter.org/uploads/2011/11/Outreach_Event_Sign-InSheets.pdf">Sign In Sheet</a> | <a href="http://transbaycenter.org/uploads/2011/11/BSF_CM_Outreach_Presentation.pdf">Presentation</a></p>
<p>A pre-prosal conference was held on Friday, December 2, 2011 at the Transbay Joint Powers Authority offices.  The sign in sheets and presentation are posted below.<br />
<a href="http://transbaycenter.org/uploads/2012/01/BSF_CM_Outreach_Presentation.pdf">Pre-Proposal Presentation</a> | <a href="http://transbaycenter.org/uploads/2012/01/PreProposal_Conference_Sign-InSheets.pdf">Pre-Proposal Sign-in Sheets</a></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2012/01/QandA_RFP_11-04.pdf">Questions &amp; Answers</a></td>
<td>50KB .pdf</td>
<td>12/15/2011</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/BSF_CM_RFP_WAPP.pdf">RFP 11-04: Construction Management Services for Bus Storage Facility</a></td>
<td>2,819KB .pdf</td>
<td>11/10/2011</td>
</tr>
<tr>
<td>Appendix E Attachment 3:  <a href="http://transbaycenter.org/uploads/2011/11/Hourly-Rate-Fee-Proposal-Form.doc">Fee Proposal Form</a></td>
<td>82KB .doc</td>
<td>11/10/2011</td>
</tr>
<tr>
<td>Appendix E Attachment 5:  <a href="http://transbaycenter.org/uploads/2011/11/DBE-SBE-form.xls">DBE/SBE Forms</a></td>
<td>83KB .xls</td>
<td>11/10/2011</td>
</tr>
</tbody>
</table>
<p><span id="MainContentBlock">The TJPA is prepared to select one Respondent to perform the services for a term of three years, with options to extend for an additional two<br />
one-year options.</span></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFP Dates</strong></td>
</tr>
<tr>
<td>RFP Issued</td>
<td>Thursday, November 10, 2011</td>
</tr>
<tr>
<td>Pre-Proposal Conference</td>
<td>Friday, December 2, 2011, 10:00 am</td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>Friday, December 9, 2011, 5:00 pm</td>
</tr>
<tr>
<td>Responses to Written Questions Posted</td>
<td>By Friday, December 16, 2011</td>
</tr>
<tr>
<td>Proposals Due</td>
<td>Wednesday, January 11, 2012, 3:00 pm</td>
</tr>
<tr>
<td>Notification of Interviews</td>
<td>Friday, January 20, 2012</td>
</tr>
<tr>
<td>Interviews</td>
<td>Friday, January 27, 2012</td>
</tr>
<tr>
<td>Contract Recommended for Award</td>
<td>Thursday, March 8, 2012</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/construction-management-services-for-bus-storage-facility/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CAC Meeting – January 10, 2012 (Cancelled)</title>
		<link>http://transbaycenter.org/calendar-items/cac-meeting-%e2%80%93-tuesday-january-10-2012</link>
		<comments>http://transbaycenter.org/calendar-items/cac-meeting-%e2%80%93-tuesday-january-10-2012#comments</comments>
		<pubDate>Wed, 11 Jan 2012 00:30:58 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7701</guid>
		<description><![CDATA[5:30 pm&#124; TJPA Offices&#124; 201 Mission Street, Suite 2100&#124; San Francisco, CA 94105]]></description>
			<content:encoded><![CDATA[<p><em>The CAC Meeting scheduled for Tuesday, January 10, 2012 has been canceled. </p>
<p><a href="http://bit.ly/xqbyw5">View Cancellation Notice</a>.</em> </p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/cac-meeting-%e2%80%93-tuesday-january-10-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, January 6, 2012 &#8211; Sunday, January 15, 2012</title>
		<link>http://transbaycenter.org/updates/friday-january-6-2012-sunday-january-15-2012</link>
		<comments>http://transbaycenter.org/updates/friday-january-6-2012-sunday-january-15-2012#comments</comments>
		<pubDate>Sat, 07 Jan 2012 01:15:48 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7767</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/zA3EUh">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-january-6-2012-sunday-january-15-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, December 30, 2011 &#8211; Sunday, January 8, 2012</title>
		<link>http://transbaycenter.org/updates/friday-december-30-2011-sunday-january-8-2012</link>
		<comments>http://transbaycenter.org/updates/friday-december-30-2011-sunday-january-8-2012#comments</comments>
		<pubDate>Fri, 30 Dec 2011 23:45:06 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7729</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/w0zsNs ">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-december-30-2011-sunday-january-8-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>2011 Financial Statements</title>
		<link>http://transbaycenter.org/documents/2011-financial-statements</link>
		<comments>http://transbaycenter.org/documents/2011-financial-statements#comments</comments>
		<pubDate>Thu, 29 Dec 2011 21:45:32 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[Documents]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7732</guid>
		<description><![CDATA[]]></description>
			<content:encoded><![CDATA[]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/documents/2011-financial-statements/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, December 23, 2011 &#8211; Sunday, January 1, 2012</title>
		<link>http://transbaycenter.org/updates/december-23</link>
		<comments>http://transbaycenter.org/updates/december-23#comments</comments>
		<pubDate>Fri, 23 Dec 2011 01:13:02 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7696</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/vkRsyi">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/december-23/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, December 16, 2011- Sunday, December 25, 2011</title>
		<link>http://transbaycenter.org/updates/friday-december-16-2011-sunday-december-25-2011</link>
		<comments>http://transbaycenter.org/updates/friday-december-16-2011-sunday-december-25-2011#comments</comments>
		<pubDate>Sat, 17 Dec 2011 03:36:37 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7683</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/rAOpeS">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-december-16-2011-sunday-december-25-2011/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CAC Meeting &#8211; December 13, 2011</title>
		<link>http://transbaycenter.org/calendar-items/cac-meeting-tuesday-december-13-2011</link>
		<comments>http://transbaycenter.org/calendar-items/cac-meeting-tuesday-december-13-2011#comments</comments>
		<pubDate>Wed, 14 Dec 2011 00:30:49 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7646</guid>
		<description><![CDATA[TRANSBAY JOINT POWERS AUTHORITY
CITIZENS ADVISORY COMMITTEE
NOTICE OF MEETING AND CALENDAR
Tuesday, December 13, 2011
TJPA Offices
201 Mission Street, Suite 2100 San Francisco, CA
5:30 p.m. to 7:30 p.m.
CITIZENS ADVISORY COMMITTEE
Jim Lazarus, Chair
Andrew Brooks, Vice Chair









Anthony Dimas
BJ Dietz Epstein
Michael Freeman


Kelly Gregory
Steve Im
Marcus Krause


David Milton
Jane Morrison
D&#8217;Arcy Myjer


Ted Olsson
Nathan Rapp
Pascale Soumoy


Marla Wilson
 
 


 
 
 


Executive Director
Staff Liaison
CAC Secretary


Maria Ayerdi-Kaplan
Robert [...]]]></description>
			<content:encoded><![CDATA[<h1 style="text-align: center;">TRANSBAY JOINT POWERS AUTHORITY</h1>
<h1 style="text-align: center;">CITIZENS ADVISORY COMMITTEE</h1>
<h1 style="text-align: center;">NOTICE OF MEETING AND CALENDAR</h1>
<p style="text-align: center;">Tuesday, December 13, 2011</p>
<p style="text-align: center;">TJPA Offices<br />
201 Mission Street, Suite 2100 San Francisco, CA<br />
5:30 p.m. to 7:30 p.m.</p>
<h3 style="text-align: center;">CITIZENS ADVISORY COMMITTEE</h3>
<p style="text-align: center;">Jim Lazarus, Chair<br />
Andrew Brooks, Vice Chair</p>
<div class="table">
<table border="0" width="100%" align="center" summary="List of CAC Members">
<colgroup span="1">
<col align="center" span="1" width="33.33%"></col>
<col align="center" span="1" width="33.33%"></col>
<col align="center" span="1" width="33.33%"></col>
</colgroup>
<tbody>
<tr>
<td style="text-align: center;">Anthony Dimas</td>
<td style="text-align: center;">BJ Dietz Epstein</td>
<td style="text-align: center;">Michael Freeman</td>
</tr>
<tr>
<td style="text-align: center;">Kelly Gregory</td>
<td style="text-align: center;">Steve Im</td>
<td style="text-align: center;">Marcus Krause</td>
</tr>
<tr>
<td style="text-align: center;">David Milton</td>
<td style="text-align: center;">Jane Morrison</td>
<td style="text-align: center;">D&#8217;Arcy Myjer</td>
</tr>
<tr>
<td style="text-align: center;">Ted Olsson</td>
<td style="text-align: center;">Nathan Rapp</td>
<td style="text-align: center;">Pascale Soumoy</td>
</tr>
<tr>
<td style="text-align: center;">Marla Wilson</td>
<td> </td>
<td> </td>
</tr>
<tr>
<td> </td>
<td> </td>
<td> </td>
</tr>
<tr>
<td style="text-align: center;"><strong>Executive Director</strong></td>
<td style="text-align: center;"><strong>Staff Liaison</strong></td>
<td style="text-align: center;"><strong>CAC Secretary</strong></td>
</tr>
<tr>
<td style="text-align: center;">Maria Ayerdi-Kaplan</td>
<td style="text-align: center;">Robert Beck</td>
<td style="text-align: center;">Margie Cleland</td>
</tr>
</tbody>
</table>
</div>
<ol style="text-align: left;">
<li>Call to Order (5 minutes)</li>
<li>Approval of Minutes of October 11, 2011 Meeting (5 minutes)</li>
<li>Staff Report (5 minutes)</li>
<li><a href="http://transbaycenter.org/uploads/2011/12/CAC-Construction-Update-12-13-11.pdf">Construction Update</a> (5 minutes)</li>
<li>Redevelopment Update on Block 6/7 Development Proposals (10 minutes)</li>
<li><a href="http://transbaycenter.org/uploads/2011/12/Urban-Park-Designs.pdf">Redevelopment Update on Streetscape Design</a> (20 minutes)</li>
<li><a href="http://transbaycenter.org/uploads/2011/12/CAC_Funding_Plan_Update_121311.pdf">Funding Plan Update</a> (10 minutes)</li>
<li><a href="http://transbaycenter.org/uploads/2011/12/Archaeology_12.13.11.pdf">Archeology Update</a> (30 minutes)</li>
<li><a href="http://transbaycenter.org/uploads/2011/12/CAHSR_12.13.2011.pdf">CHSRA Updated Business Plan </a>(20 minutes)</li>
<li>Public Comment (5 minutes)</li>
<li>CAC Member Comments &amp; Future Agenda Requests</li>
<li>Adjourn</li>
</ol>
<p>The Transbay Joint Powers Authority Citizens Advisory Committee meeting will be held at the Transbay Joint Powers Authority office at 201 Mission Street, Suite 2100, San Francisco, CA. The closest accessible BART station is the Embarcadero Street Station at Beale and Market Street. Accessible MUNI lines serving this location are: Muni Metro Lines J-Church, K-Ingleside, L-Taraval, M-Oceanview, N-Judah and T-Third at the Embarcadero Street Station; F- Market line; 14-Mission; 30X-Marina Express; 21-Hayes; 31-Balboa; 38 Geary; 20-Union; 41-Union; 2-Clement; 71-Haight; 9-San Bruno; 5-Fulton; 6-Parnassas; and 10-Townsend. For information about MUNI services call 311 or view the MUNI map at <a href="http://www.sfmta.com/cms/mmaps/indxmaps.htm" target="_blank">http://www.sfmta.com/cms/mmaps/indxmaps.htm</a>.</p>
<p>The meeting room is wheelchair accessible. There is accessible parking available in the 201 Mission Street parking lot located directly behind the building. The parking lot entrance is in the 200 block of Howard Street (between Beale and Main Street).</p>
<p>If you require the use of an American Sign Language interpreter, a sound enhancement system, or a reader during the meeting, such person or system can be made available upon request; please contact the TJPA at (415) 597-4620, at least 72 hours prior to the meeting. Late requests will be honored if possible. Calendars and minutes of the meeting may be available in alternative formats; please contact the TJPA at (415) 597-4620 at least 72 hours in advance of need. </p>
<p>To assist the TJPA’s efforts to accommodate persons with severe allergies, environmental illness, multiple chemical sensitivity or related disabilities, attendees at public meetings are reminded that other attendees may be sensitive to various chemical based products. Please help TJPA to accommodate these individuals.</p>
<p>The ringing of and use of cell phones, pagers and similar sound-producing electronic devices are prohibited at this meeting. Please be advised that the Chair may order the removal from the meeting room of any person(s) responsible for the ringing or use of a cell phone, pager, or other similar sound-producing electronic devices.</p>
<p>The Ethics Commission of the City and County of San Francisco has asked us to remind individuals that influence or attempt to influence local legislative or administrative action may be required by the San Francisco Lobbyist Ordinance [Campaign and Gov’t Conduct Code, Article II, Chapter 1, § 2.100, et seq.) to register and report lobbing activity. For more information about the Lobbyist Ordinance, please contact the Ethics Commission at 25 Van Ness Avenue, Suite 220, San Francisco, CA 94102, telephone (415) 252-3100, fax (415) 252-3124 and web site: <a href="http://www.sfgov.org/ethics" target="_blank">sfgov.org/ethics</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/cac-meeting-tuesday-december-13-2011/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Friday, December 9, 2011 &#8211; Sunday, December 18, 2011</title>
		<link>http://transbaycenter.org/updates/friday-december-9-2011-sunday-december-18-2011</link>
		<comments>http://transbaycenter.org/updates/friday-december-9-2011-sunday-december-18-2011#comments</comments>
		<pubDate>Sat, 10 Dec 2011 02:31:35 +0000</pubDate>
		<dc:creator>tjpa</dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7651</guid>
		<description><![CDATA[10 Day Look Ahead: Transbay Construction Activities]]></description>
			<content:encoded><![CDATA[<p>10 Day Look Ahead: Transbay Construction Activities<br />
<a href="http://bit.ly/tUuV3s">Click to Download</a></p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/updates/friday-december-9-2011-sunday-december-18-2011/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Board Meeting &#8211; December 8, 2011</title>
		<link>http://transbaycenter.org/calendar-items/board-meeting-december-8-2011</link>
		<comments>http://transbaycenter.org/calendar-items/board-meeting-december-8-2011#comments</comments>
		<pubDate>Thu, 08 Dec 2011 19:00:03 +0000</pubDate>
		<dc:creator>ngonzales</dc:creator>
				<category><![CDATA[Calendar Items]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7241</guid>
		<description><![CDATA[TRANSBAY JOINT POWERS AUTHORITY
BOARD OF DIRECTORS 
NOTICE OF MEETING AND CALENDAR
 
Thursday, December 8, 2011
1 Dr. Carlton B. Goodlett Place, Room 416
San Francisco, CA 
 
REGULAR MEETING
9:30 a.m. 
 
BOARD OF DIRECTORS
Jane Kim, Chair
Elsa Ortiz, Vice Chair
Art Lloyd
Gabriel Metcalf
Edward Reiskin
Bijan Sartipi 
 
Executive Director
Maria Ayerdi-Kaplan 
 
Secretary
Nila Gonzales 
 
 
201 Mission St. #2100
San Francisco, California  94105
415-597-4620
415-597-4615 fax
 
 
ACCESSIBLE MEETING POLICY
The Transbay Joint Powers Authority meeting will be held [...]]]></description>
			<content:encoded><![CDATA[<p style="text-align: center;"><strong>TRANSBAY JOINT POWERS AUTHORITY<br />
</strong><strong>BOARD OF DIRECTORS</strong><strong> </strong></p>
<p align="center"><strong>NOTICE OF MEETING AND CALENDAR<br />
</strong> </p>
<p align="center">Thursday, December 8, 2011<br />
1 Dr. Carlton B. Goodlett Place, Room 416<br />
San Francisco, CA </p>
<p align="center"> </p>
<p align="center">REGULAR MEETING<br />
9:30 a.m. </p>
<p align="center"> </p>
<p align="center">BOARD OF DIRECTORS</p>
<p align="center">Jane Kim, Chair<br />
Elsa Ortiz, Vice Chair<br />
Art Lloyd<br />
Gabriel Metcalf<br />
Edward Reiskin<br />
Bijan Sartipi </p>
<p> </p>
<p align="center">Executive Director<br />
Maria Ayerdi-Kaplan </p>
<p align="center"> </p>
<p align="center">Secretary<br />
Nila Gonzales </p>
<p> </p>
<p> </p>
<p align="center">201 Mission St. #2100<br />
San Francisco, California  94105<br />
415-597-4620<br />
415-597-4615 fax</p>
<p> </p>
<p> </p>
<p align="center">ACCESSIBLE MEETING POLICY</p>
<p>The Transbay Joint Powers Authority meeting will be held in Room 416, at 1 Dr. Carlton B. Goodlett Place, San Francisco, CA.  The closest accessible BART station is the Civic Center Station at United Nations Plaza and Market Street.  Accessible MUNI lines serving this location are:  Muni Metro Lines J‑Church, K‑Ingleside, L‑Taraval, M‑Oceanview, N‑Judah, and T-Third at Van Ness and Civic Center Stations; F-Market; 19-Polk, 47‑Van Ness; 49-Mission-Van Ness; 5-Fulton; 6 Parnassus; 21-Hayes; 9‑San Bruno; and 71‑Haight Noriega.  For more information about MUNI services call 311. </p>
<p>The meeting room is wheelchair accessible.  Accessible curbside parking spaces have been designated on the Van Ness Avenue and McAllister Street perimeters of City Hall for mobility-impaired persons.  There is accessible parking available within the Civic Center Underground Parking Garage at the corner of McAllister and Polk Streets, and within the Performing Arts Parking Garage at Grove and Franklin Streets. </p>
<p>If you require the use of an American Sign Language interpreter, a sound enhancement system, or a reader during the meeting, such person or system can be made available upon request; please contact Nila Gonzales at (415) 597-4620 or <a href="mailto:NGonzales@TransbayCenter.org">NGonzales@TransbayCenter.org</a>, at least 72 hours prior to the meeting.  Late requests will be honored if possible.  Calendars and minutes of the meeting may be available in alternative formats; please contact Nila Gonzales at (415) 597-4620 or <a href="mailto:NGonzales@TransbayCenter.org">NGonzales@TransbayCenter.org</a> at least 72 hours in advance of need.  Written reports or background materials for calendar items are available for public inspection and copying at 201 Mission St. Suite 2100 during regular business hours and are available online at <a href="http://www.transbaycenter.org/">www.TransbayCenter.org</a>. </p>
<p>To assist the City’s efforts to accommodate persons with severe allergies, environmental illness, multiple chemical sensitivity or related disabilities, attendees at public meetings are reminded that other attendees may be sensitive to various chemical based products.  Please help the City to accommodate these individuals. </p>
<p>The ringing and use of cell phones, pagers and similar sound-producing electronic devices are prohibited at this meeting.  Please be advised that the Chair may order the removal from the meeting room of any person(s) responsible for the ringing or use of a cell phone, pager, or other similar sound-producing electronic devices.</p>
<p> </p>
<p>9:30 – REGULAR MEETING</p>
<p align="center">ORDER OF BUSINESS </p>
<p>1.  Call to Order </p>
<p>2.  Roll Call </p>
<p>3.  Communications </p>
<p>4.  Board of Director’s New and Old Business </p>
<p>5.  Executive Director’s Report</p>
<ul>
<li>Quarterly Financial <a href="http://transbaycenter.org/uploads/2011/12/ED-Report_FY12-Q1-QRTRLY-REPORTS.pdf" target="_blank">Reports</a></li>
<li>Archaeology <a href="http://transbaycenter.org/uploads/2011/12/ED-Report_Archaeology-Presentation.pdf" target="_blank">Presentation</a></li>
<li>Construction <a href="http://transbaycenter.org/uploads/2011/12/ED-Report_Construction-Update-12-8-11.pdf" target="_blank">Update</a></li>
</ul>
<p>6.  Public Comment </p>
<p>    Members of the public may address the Authority on matters that are within the Authority&#8217;s<br />
    jurisdiction and are not on today&#8217;s calendar.<br />
 </p>
<p>THE FOLLOWING MATTERS BEFORE THE TRANSBAY JOINT POWERS AUTHORITY ARE RECOMMENDED FOR ACTION AS STATED BY THE EXECUTIVE DIRECTOR OR THE CHAIR.<br />
 </p>
<p align="center">REGULAR CALENDAR</p>
<p>7.  Presentation of Transbay Transit Center <a href="http://transbaycenter.org/uploads/2011/12/Item7_TTC-Architectural-Update-12-8-11.pdf" target="_blank">Architectural Update</a> by Pelli Clarke Pelli Architects.</p>
<p>8.  Presentation of Transbay Neighborhood Streetscape and Open Space by San Francisco Redevelopment Agency. </p>
<p>9.  Presentation of the audited <a href="http://transbaycenter.org/uploads/2011/12/Item9_Audit-FY11.pdf" target="_blank">Financial Statements</a> for the fiscal year ended June 30, 2011 and the Report to the Board of Directors. </p>
<p>10. Adopting a <a href="http://transbaycenter.org/uploads/2011/12/Item10_Addendum-6_Bus-Ramps-Staff-Report-Reso-with-attachment.pdf" target="_blank">Sixth Addendum</a> to the Transbay Terminal / Caltrain Downtown Extension / Redevelopment Project Final Environmental Impact Statement/Environmental Impact Report for minor refinements to the proposed bus ramp component of the Transbay Program. </p>
<p>11.  Authorizing an <a href="http://transbaycenter.org/uploads/2011/12/Item11_CMGC-Mod-20-Increase-Pre-Construction-Staff-Report-Reso-with-mod.pdf" target="_blank">Amendment to Contract No. 08-04-CMGC-000</a>, Construction Manager/General Contractor Services for the Construction of the Transbay Transit Center Building and Related Structures, with the joint venture of Webcor Builders and Obayashi Corporation, to increase the time for preconstruction services to 160,000 hours and adjust the contract sum to reflect the final cost of services performed under Amendment No. 02. </p>
<p>12. Approving <a href="http://transbaycenter.org/uploads/2011/12/Item12_Calpers-December-Final-Retirement-Health-with-Contract-Staff-Report-Reso.pdf" target="_blank">Resolutions</a> to remove Local Government Services as an intermediary for benefits and payroll between the TJPA and TJPA staff. </p>
<p>13. Approving the Minutes of the <a href="http://transbaycenter.org/uploads/2011/12/11-10-11_Minutes.pdf" target="_blank">November 10, 2011</a> meeting.<br />
 </p>
<p>ADJOURN </p>
<p>The Ethics Commission of the City and County of San Francisco has asked us to remind individuals that influence or attempt to influence local legislative or administrative action may be required by the San Francisco Lobbyist Ordinance [Campaign and Gov't Conduct Code, Article II, Chapter 1, § 2.100, et seq.] to register and report lobbying activity.  For more information about the Lobbyist Ordinance, please contact the Ethics Commission at 25 Van Ness Avenue, Suite 220, San Francisco, CA 94102, telephone (415) 252-3100, fax (415) 252-3124 and web site: www.sfethics.org.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/calendar-items/board-meeting-december-8-2011/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

