<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Transbay Center &#187; RFPs</title>
	<atom:link href="http://transbaycenter.org/category/rfp/feed" rel="self" type="application/rss+xml" />
	<link>http://transbaycenter.org</link>
	<description></description>
	<lastBuildDate>Thu, 01 Nov 2012 06:00:00 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Glazing Design-Build</title>
		<link>http://transbaycenter.org/rfp/glazing-design-build</link>
		<comments>http://transbaycenter.org/rfp/glazing-design-build#comments</comments>
		<pubDate>Thu, 01 Nov 2012 06:00:00 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5185</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG08.1


Bid Title:
Glazing Design/Build Construction Services


Bid Due Date SUSPENDED:
Bid Date Suspended to Fall of 2012 (formerly January 11, 2012)


Time Due:
2:00 p.m.


Estimated Cost:
in excess of $40,000,000


SBE Requirement:
20%



Description:
The scope of work for the Design/Build Glazing Systems Package includes all glazing systems currently labeled in the bidding documents as W-1, W-3, W-4, W-8, and W-10.  Major scope elements [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG08.1</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Glazing Design/Build Construction Services</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date SUSPENDED:</td>
<td>Bid Date Suspended to Fall of 2012 (formerly January 11, 2012)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>2:00 p.m.</td>
</tr>
<tr>
<td style="text-align: right;">Estimated Cost:</td>
<td>in excess of $40,000,000</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>20%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
The scope of work for the Design/Build Glazing Systems Package includes all glazing systems currently labeled in the bidding documents as W-1, W-3, W-4, W-8, and W-10.  Major scope elements for this package will consist of, but are not limited to, the following:</p>
<ul>
<li>Perform services including the preparation of glazing system design documents, engineered calculations, and detailed coordination shop drawings with associated 2-D &amp; 3-D modeling. Trade Subcontractor to provide coordination, constructability reviews and sequence of installation advice to assist Architect in finalizing the construction documents where glazing systems interface with other aspects of the building (i.e., structural steel, security systems, lighting, etc.).  The process shall be collaborative where all members of the design and contracting team mutually refine and update their respective construction documents to illustrate the full design intent.</li>
<li>Provide all calculations including the verification of blast requirements as specified in the Contract Documents.  Provide all necessary system component and supporting data for testing criteria and all specified test results from blast analysis.</li>
<li>Engineer, prepare, coordinate, conduct and complete all specified on- and off-site testing and mock-ups.</li>
<li>Coordinate all other trade scope system interfaces with W systems (i.e., future fixtures, LEDs, security, signs, etc.) as shown and specified in the Contract Documents.</li>
<li>Fabricate and install all systems and system structures (i.e., all structural and support assemblies that are welded and/or bolted to primary building structure, etc.). Bolted assemblies and their location on primary structures require additional coordination with steel fabricators in conjunction with continuous on- and off-site quality control, shop drawings review and coordination, review and confirmation of all of bolted assemblies including, but not limited to, on-site coordination during fabrication at fabricator facilities.</li>
<li>Furnish and install all specific glazing assemblies and components per bidding documents, including but not limited to all required frit patterns, laminate(s) types, edge treatment, tempering, gaskets and sealants.</li>
<li>Furnish and install all associated aluminum and stainless steel panels, enclosures, escutcheons, trim profiles and any/all aluminum and stainless steel flashing, closure plates and backing assemblies as shown for each W system. All paneling and trims at floor finish levels require coordination with finish floor assemblies and locations. Coordination of receiving trims adjacent to finish flooring requires properly sized and fabricated receiving trims, panels and caps.  </li>
<li>Furnish and install all system expansion joints and subassemblies where specified; all bird deterrent systems; all smoke seals and fire safeing at slab edges; all architectural, structural and fire caulking at joint locations, to adjacent surfaces and to all dissimilar materials where shown and/or specified and by code; vapor barriers; specified protective coatings; welded or bolted plate assemblies to structural steel and/or embedded in concrete and all miscellaneous iron in direct support of glazing systems.</li>
<li>Furnish and install all waterproofing and associated backing plates and support assemblies as specified. All waterproofing assemblies require detailed, systematic coordination and scheduling for proper sequencing of other trades and waterproofing applications. Installation requires multiple mobilizations and non-sequential installations for areas where detailed system interface requires multiple trades to work in tandem in achieving required installations.     </li>
<li>Coordinate and provide support structures requiring interface with other trades (i.e., future lighting, signage, exit signage, etc.).</li>
<li>Design, provide and install all associated system embeds including, but not limited to, field layout, verification of control, grouting and all necessary concrete pour watch manpower.</li>
<li>Coordinate, design and install integral fall protection components for W-8 and W-10 systems only.</li>
</ul>
<p>The selection process for this package has been a three-step process:  1. Request for Qualifications, 2. Request for Design Proposals, and 3. Invitation for Bids.  Trade Subcontractors must be pre-qualified through the first two steps in order to submit a Bid.  Pre-qualified bidders are:</p>
<ul>
<li>Enclos Corp.</li>
<li>Josef Gartner USA (division of Permasteelisa North America Corp.)</li>
<li>NEC of California, Inc., dba Mero/NEC</li>
</ul>
<p>Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A mandatory (for Bidders, not subcontractors to Bidders) pre-bid conference was held on June 21, 2011 at 1:00 pm at TJPA offices, 201 Mission Street, Suite 2100, San Francisco, CA.  The pre-bid conference was followed by an SBE networking session.  An additional SBE networking session was held on June 22. <a href="http://transbaycenter.org/uploads/2011/09/TG08_1_IFB_Pre_Bid_Presentation.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/09/TG08_1_IFB_Pre_Bid_Presentation_Signins.pdf">Pre-Bid Sign-in Sheets</a> | <a href="http://transbaycenter.org/uploads/2011/09/TG08_1_IFB_SBE_Networking_Signins.pdf">SBE Networking Sessions Sign-in Sheets</a></p>
<p>If Webcor/Obayashi Joint Venture chooses to recommend any of the qualified subcontractors for the Glazing Design-Build contract to the TJPA for its approval, the Subcontractor will be required to comply with all TJPA contract requirements.   Trade Subcontractors bidding for the Glazing Design-Build package will be required to have second-tier subcontractors in order to meet a Small Business Enterprise (SBE) participation goal of 20 percent.  SBE is defined in the TJPA <a href="http://transbaycenter.org/uploads/2009/07/SBE_Policy_No_015_Rev1.pdf">Small Business Enterprise Program</a>.  <em><a href="http://transbaycenter.org/uploads/2009/07/DBE-SBE-Fact-Sheet.pdf">Learn more about the TJPA SBE Program.</a></em></p>
<p><strong><em>Questions on Bid Documents has been extended to 2:00 pm on August 5, 2011.</em></strong></p>
<p><strong><em>Bid Due Date has been Suspended to Fall 2012.</em></strong></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2012/10/TG08-1_IFB_Addendum_04.pdf">IFB Addendum #4</a> (Addendum #4 SUSPENDS the Bid Date to Fall 2012)</td>
<td>46KB .pdf</td>
<td>01/06/12</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_Addendum_03.pdf">IFB Addendum #3</a> (Addendum #3 SUSPENDS the Bid Date to January 11, 2012 at 2:00 pm)</td>
<td>109KB .pdf</td>
<td>10/17/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_Addendum_02.pdf">IFB Addendum #2</a> (Documents noted below as Rev C are updated in Addendum #2; revised plans/specs available from Ford Graphics)</td>
<td>72KB .pdf</td>
<td>9/9/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/10/TG08-1_IFB_Addendum_01.pdf">IFB Addendum #1</a> (Documents noted below as Rev B are updated in Addendum #1; revised plans/specs available from Ford Graphics)</td>
<td>158KB .pdf</td>
<td>7/25/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_QA_3.pdf">IFB Questions and Answers #3</a></td>
<td>8108KB .pdf</td>
<td>8/23/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08_1_QandA_2.pdf">IFB Questions and Answers #2</a></td>
<td>491KB .pdf</td>
<td>7/25/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08_1_QandA.pdf">IFB Questions and Answers #1</a></td>
<td>73KB .pdf</td>
<td>7/1/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_IFB_Cover.pdf">Invitation for Bids Cover Letter </a></td>
<td>100KB .pdf</td>
<td>6/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_ExhibitA_Addendum_02.pdf">Invitation for Bids Exhibit A</a> (Rev C)</td>
<td>197KB .pdf</td>
<td>9/9/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG08-1_IFB_Subcontract_ExhibitsB-X_Add02.pdf">Invitation for Bids Subcontract and Exhibits B-X</a> (Rev C)</td>
<td>8934KB .pdf</td>
<td>9/9/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_IFB_BidManual.pdf">Invitation for Bids Project Bidding Manual</a></td>
<td>240KB .pdf</td>
<td>6/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/09/TG08-1_IFB_Advert.pdf">Invitation for Bids Advertisement</a></td>
<td>43KB .pdf</td>
<td>6/3/11</td>
</tr>
</tbody>
</table>
<p> </p>
<table border="1" width="85%">
<tbody>
<tr>
<td width="75%"><strong>Qualification/Proposal Documents</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_4_Cover-_and_Narrative.pdf">RFDP Addendum #4</a></td>
<td>38KB .pdf</td>
<td>3/31/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_3_Cover-_and_Narrative.pdf">RFDP Addendum #3</a></td>
<td>70KB .pdf</td>
<td>1/14/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_2.pdf">RFDP Addendum #2</a></td>
<td>94KB .pdf</td>
<td>1/14/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_Addendum1.pdf">RFDP Addendum #1</a></td>
<td>576KB .pdf</td>
<td>12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_Pre-Design_Presentation1.pdf">RFDP Pre-Proposal Presentation</a></td>
<td>1393KB .pdf</td>
<td>11/18/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_Pre-Proposal_Signins.pdf">RFDP Pre-Proposal Sign-in Sheet</a></td>
<td>965KB .pdf</td>
<td>11/18/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG08-1_Addendum_3_ExhibitA.pdf">Glazing Design-Build RFDP</a> (Rev D)</td>
<td>118KB .pdf</td>
<td>1/14/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-01_RFDP_Advertisement.pdf">RFDP Advertisement</a></td>
<td>16KB .pdf</td>
<td>11/12/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_RFQ.pdf">Glazing Design-Build RFQ</a></td>
<td>186KB .pdf</td>
<td>10/4/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG08-1_RFQ_Advertisement.pdf">RFQ Advertisement</a></td>
<td>13KB .pdf</td>
<td>10/4/10</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/glazing-design-build/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing</title>
		<link>http://transbaycenter.org/rfp/structural-concrete-substructure-waterproofing-geothermal-mechanical-electrical-and-plumbing</link>
		<comments>http://transbaycenter.org/rfp/structural-concrete-substructure-waterproofing-geothermal-mechanical-electrical-and-plumbing#comments</comments>
		<pubDate>Thu, 12 Jan 2012 21:00:39 +0000</pubDate>
		<dc:creator>ephillips</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7477</guid>
		<description><![CDATA[REQUEST FOR QUALIFICATIONS TG06:  STRUCTURAL CONCRETE SUBSTRUCTURE, WATERPROOFING, GEOTHERMAL,
MECHNICAL, ELECTRICAL AND PLUMBINGCONSTRUCTION SERVICES 
Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) from Trade Subcontractors interested in bidding the Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing Construction Services on the contract for the Transbay Transit Center (TTC) Project located in [...]]]></description>
			<content:encoded><![CDATA[<p align="center"><strong>REQUEST FOR QUALIFICATIONS <strong>TG06</strong>:  </strong><strong>STRUCTURAL CONCRETE SUBSTRUCTURE, WATERPROOFING, GEOTHERMAL,<br />
MECHNICAL, ELECTRICAL AND PLUMBING</strong><strong>CONSTRUCTION SERVICES</strong><strong> </strong></p>
<p>Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) from Trade Subcontractors interested in bidding the Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California.</p>
<p>Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with structural concrete foundations, reinforcement, embedded items, substructure construction, below-grade waterproofing, geothermal systems, mechanical, electrical, and plumbing infrastructure on complex projects which present significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade:  Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing</p>
<p>Trade Subcontractors will be required to have second-tier subcontractors in order to meet the Transbay Joint Powers Authority’s (TJPA’s) Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) participation goals; these Second-tier subcontractors who will be involved with these requirements do not need to respond to this RFQ.  </p>
<p>If Webcor/Obayashi Joint Venture chooses to recommend any of the Structural Concrete Substructure, Waterproofing, Geothermal, Mechanical, Electrical and Plumbing contract work to the TJPA for its approval, the Trade Subcontractor will be asked to comply with all TJPA contract requirements.</p>
<p>Contract documents, including plans and specifications, for the project are anticipated to be available for bidding in March 2012. The estimated date for issuing the Notice to Proceed (NTP) for construction is June 2012.  </p>
<p>Trade Subcontractors shall submit and will be evaluated on information with respect to their experience on projects of similar size, scope and complexity.  The information shall include general and specific experience, claim and surety history, financials, ability to meet schedule and budget requirements and skills in general management and coordination.  Resumes of key personnel who will manage and supervise the construction shall be provided in the RFQ response.</p>
<p>Trade Subcontractors must hold valid contractor licenses and must provide ability to obtain corporate surety (payment &amp; performance) bonds and insurance in order to be eligible for the qualification (RFQ) evaluation.  Starting November 9, 2011, RFQ packages will be available from Webcor/Obayashi Joint Venture and from the TJPA.  Interested Subcontractors should download the RFQ directly from this webpage (below); or contact Webcor/Obayashi Joint Venture by e-mail at <a href="mailto:TransbayBidding@webcor-obayashi.com">TransbayBidding@webcor-obayashi.com</a>, or fax at (510) 748-7805 to obtain a package.</p>
<p>Trade Subcontractors shall submit one (1) original and four (4) copies of their RFQ responses by 2:00 p.m. on January 12, 2012, to Jeff Heath, Webcor/Obayashi Joint Venture, located at 175 Beale Street, San Francisco, CA  94105.</p>
<p>Webcor/Obayashi Joint Venture at its own discretion may conduct interviews with any or all of the Subcontractors responding to this RFQ to better determine their qualifications to perform work required under the project. </p>
<p>The evaluation of the RFQ is solely for the purpose of determining Trade Subcontractors who would be deemed qualified to bid for and perform the work outlined in the RFQ. </p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2012/01/TG06-RFQ-QA-111215.pdf">Questions and Answers on RFQ Document</a></td>
<td>65KB .pdf</td>
<td>Posted 12/15/11</td>
</tr>
<tr>
<td><a href="http://bit.ly/snx8V4">Request for Qualifications TG06</a></td>
<td>241KB .pdf</td>
<td>11/9/2011</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/TG06_RFQ_Advertisement.pdf">TG06 Advertisement</a></td>
<td>20KB .pdf</td>
<td>11/9/2011</td>
</tr>
</tbody>
</table>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFQ Dates</strong></td>
</tr>
<tr>
<td>RFQ Issued</td>
<td>Wednesday, November 9, 2011</td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>By Thursday, December 8, 2011, 2:00 pm</td>
</tr>
<tr>
<td>RFQ Packages Due</td>
<td>Thursday, January 12, 2012, 2:00 pm</td>
</tr>
<tr>
<td>Qualification Notifications to Trade Subcontractors</td>
<td>Thursday, February 16, 2012</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/structural-concrete-substructure-waterproofing-geothermal-mechanical-electrical-and-plumbing/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Construction Management Services for Bus Storage Facility</title>
		<link>http://transbaycenter.org/rfp/construction-management-services-for-bus-storage-facility</link>
		<comments>http://transbaycenter.org/rfp/construction-management-services-for-bus-storage-facility#comments</comments>
		<pubDate>Wed, 11 Jan 2012 22:00:00 +0000</pubDate>
		<dc:creator>ephillips</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=7453</guid>
		<description><![CDATA[Request for Proposals for Construction Management Services
The Transbay Joint Powers Authority (TJPA) is issuing a Request for Proposals (RFP) for CONSTRUCTION MANAGEMENT SERVICES FOR BUS STORAGE STORAGE FACILITY from firms with expertise in the construction management of similar facilities.
The Bus Storage facility will be located beneath the I-80 approach to the Bay Bridge within the [...]]]></description>
			<content:encoded><![CDATA[<h1><span id="MainContentBlock"><strong>Request for Proposals for Construction Management Services</strong></span></h1>
<p>The Transbay Joint Powers Authority (TJPA) is issuing a Request for Proposals (RFP) for CONSTRUCTION MANAGEMENT SERVICES FOR BUS STORAGE STORAGE FACILITY from firms with expertise in the construction management of similar facilities.</p>
<p>The Bus Storage facility will be located beneath the I-80 approach to the Bay Bridge within the block bounded by Second, Third, Stillman, and Perry streets, and will be used for weekday, mid-day bus storage for approximately 49 buses.  The Project includes a significant amount of soil excavation and off-haul in order to facilitate construction of an at-grade parking facility for mid-day storage of transit buses, sound walls, retaining walls, fences/gates, security/access control systems, administration and support facilities, and a bus link ramp spanning over Second Street to connect with the new Bus Ramps to be constructed under a separate contract. </p>
<p>An outreach event was held on November 8, 2011 at the Transbay Joint Powers Authority offices.  The sign in sheets and presentation are posted below.<br />
<a href="http://transbaycenter.org/uploads/2011/11/Outreach_Event_Sign-InSheets.pdf">Sign In Sheet</a> | <a href="http://transbaycenter.org/uploads/2011/11/BSF_CM_Outreach_Presentation.pdf">Presentation</a></p>
<p>A pre-prosal conference was held on Friday, December 2, 2011 at the Transbay Joint Powers Authority offices.  The sign in sheets and presentation are posted below.<br />
<a href="http://transbaycenter.org/uploads/2012/01/BSF_CM_Outreach_Presentation.pdf">Pre-Proposal Presentation</a> | <a href="http://transbaycenter.org/uploads/2012/01/PreProposal_Conference_Sign-InSheets.pdf">Pre-Proposal Sign-in Sheets</a></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2012/01/QandA_RFP_11-04.pdf">Questions &amp; Answers</a></td>
<td>50KB .pdf</td>
<td>12/15/2011</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/11/BSF_CM_RFP_WAPP.pdf">RFP 11-04: Construction Management Services for Bus Storage Facility</a></td>
<td>2,819KB .pdf</td>
<td>11/10/2011</td>
</tr>
<tr>
<td>Appendix E Attachment 3:  <a href="http://transbaycenter.org/uploads/2011/11/Hourly-Rate-Fee-Proposal-Form.doc">Fee Proposal Form</a></td>
<td>82KB .doc</td>
<td>11/10/2011</td>
</tr>
<tr>
<td>Appendix E Attachment 5:  <a href="http://transbaycenter.org/uploads/2011/11/DBE-SBE-form.xls">DBE/SBE Forms</a></td>
<td>83KB .xls</td>
<td>11/10/2011</td>
</tr>
</tbody>
</table>
<p><span id="MainContentBlock">The TJPA is prepared to select one Respondent to perform the services for a term of three years, with options to extend for an additional two<br />
one-year options.</span></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFP Dates</strong></td>
</tr>
<tr>
<td>RFP Issued</td>
<td>Thursday, November 10, 2011</td>
</tr>
<tr>
<td>Pre-Proposal Conference</td>
<td>Friday, December 2, 2011, 10:00 am</td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>Friday, December 9, 2011, 5:00 pm</td>
</tr>
<tr>
<td>Responses to Written Questions Posted</td>
<td>By Friday, December 16, 2011</td>
</tr>
<tr>
<td>Proposals Due</td>
<td>Wednesday, January 11, 2012, 3:00 pm</td>
</tr>
<tr>
<td>Notification of Interviews</td>
<td>Friday, January 20, 2012</td>
</tr>
<tr>
<td>Interviews</td>
<td>Friday, January 27, 2012</td>
</tr>
<tr>
<td>Contract Recommended for Award</td>
<td>Thursday, March 8, 2012</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/construction-management-services-for-bus-storage-facility/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Constructability Review Services</title>
		<link>http://transbaycenter.org/rfp/constructability-review-services</link>
		<comments>http://transbaycenter.org/rfp/constructability-review-services#comments</comments>
		<pubDate>Sat, 23 Jul 2011 00:33:38 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=6970</guid>
		<description><![CDATA[ADVERTISEMENT FOR PARTICIPATION IN CONSTRUCTABILITY REVIEWS
GFRC CEILING CLADDING SYSTEM
STRUCTURAL STEEL DESIGN
Webcor/Obayashi Joint Venture seeks multiple trade subcontractors and/or manufacturers to participate in constructability reviews for the following:

Glass Fiber Reinforced Concrete (GFRC) Ceiling Cladding systems consisting of over +100K/SF of ceiling space for the Transbay Transit Center project
Structural Steel design consisting of over 20,000 tons of steel [...]]]></description>
			<content:encoded><![CDATA[<p align="center"><strong>ADVERTISEMENT FOR PARTICIPATION IN CONSTRUCTABILITY REVIEWS<br />
GFRC CEILING CLADDING SYSTEM<br />
STRUCTURAL STEEL DESIGN</strong></p>
<p>Webcor/Obayashi Joint Venture seeks multiple trade subcontractors and/or manufacturers to participate in constructability reviews for the following:</p>
<ul>
<li>Glass Fiber Reinforced Concrete (GFRC) Ceiling Cladding systems consisting of over +100K/SF of ceiling space for the Transbay Transit Center project</li>
<li>Structural Steel design consisting of over 20,000 tons of steel for the Transbay Transit Center project</li>
</ul>
<p>Requested services will include feasibility review of design documents and details, and providing industry-specific constructability observations and recommendations.  Participants will receive no compensation for their services.  By their constructability review and services, participants will have no right to a future contract; acceptance of services constitutes no contractual commitment or financial obligation of any kind on the part of Webcor/Obayashi Joint Venture or the Transbay Joint Powers Authority.  Participants will receive no competitive advantage from participating in the review.  Participants will be invited non-exclusively to participate in the competitive process for the final respective Trade Subcontractor packages.</p>
<p>Interested parties should send an email to <a href="mailto:TransbayBidding_TG05@webcor-obayashi.com">TransbayBidding_TG05@webcor-obayashi.com</a>.  Be sure to include complete contact information, including company name, address, phone number, email address, and point of contact.  We also require a brief description of your business including:  services provided, years providing those services, and at least three project examples.</p>
<p>Webcor/Obayashi Joint Venture reserves the right to reject any inquiry and terminate any service at will.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/constructability-review-services/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Logistics Site Maintenance and Control</title>
		<link>http://transbaycenter.org/rfp/site-logistics-site-maintenance</link>
		<comments>http://transbaycenter.org/rfp/site-logistics-site-maintenance#comments</comments>
		<pubDate>Fri, 10 Jun 2011 06:45:57 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=6141</guid>
		<description><![CDATA[Request for Proposals for Site Maintenance and Control Services
Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for Trade Package # TG05.7: Site Maintenance &#038; Control Services for the Transbay Transit Center (TTC) Project located in San Francisco, California.
Trade Subcontractors shall possess a valid and [...]]]></description>
			<content:encoded><![CDATA[<h1><span id="MainContentBlock"><strong>Request for Proposals for Site Maintenance and Control Services</strong></span></h1>
<p>Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for Trade Package # TG05.7: Site Maintenance &#038; Control Services for the Transbay Transit Center (TTC) Project located in San Francisco, California.</p>
<p>Trade Subcontractors shall possess a valid and current California Contractor’s license for the work for which it intends to submit a proposal and must provide proof of insurance in order to be eligible for submitting an proposal.</p>
<p>Trade Subcontractors are required to be certified Small Business Enterprises (SBEs) in order to propose for this scope of work.  Information on the TJPA SBE Program is available <a title="Doing Business with the TJPA" href="http://transbaycenter.org/tjpa/doing-business-with-the-tjpa">here</a>. </p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA); ARRA requirements include submitting monthly reports of hours/jobs.</p>
<p>An optional pre-proposal conference for Trade Subcontractors interested in submitting a proposal was held on Tuesday, April 19, 2011, at 10:00 am at TJPA offices, 201 Mission Street, Suite 2100, San Francisco, CA  94105.  <a href="http://transbaycenter.org/uploads/2011/06/TG05_7_Site_Maintenance_PreProposal_Presentation.pdf">Pre-Proposal Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/06/TG05_7_SignIn_Sheets.pdf">Pre-Proposal Sign-in Sheets</a></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/Editable_QPD_Form1.doc">Editable QPD Form</a></td>
<td>52KB .pdf</td>
<td>4/19/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_7_RFP_Cover.pdf">Cover Letter</a></td>
<td>84KB .pdf</td>
<td>4/8/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_7_RFP_ExhibitA.pdf">RFP TG05.7</a></td>
<td>477KB .pdf</td>
<td>4/8/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_7_RFP_LFSC_ExhibitsC_to_I.pdf">Exhibits B through I</a> (includes Long Form Subcontract)</td>
<td>1973KB .pdf</td>
<td>4/8/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_7_RFP_Volume_1_Specs.pdf">Specifications</a></td>
<td>4740KB .pdf</td>
<td>4/8/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_7_RFP_Manual.pdf">Request for Proposals Manual (Rev 10)</a></td>
<td>446KB .pdf</td>
<td>4/8/11</td>
<td> </td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_7_RFP_Advert.pdf">Advertisement</a></td>
<td>38KB .doc</td>
<td>4/8/11</td>
</tr>
</tbody>
</table>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFP Dates</strong></td>
</tr>
<tr>
<td>RFP Issued</td>
<td>Friday, April 8, 2011</td>
</tr>
<tr>
<td>Optional Pre-Proposal Conference</td>
<td>Tuesday, April 19, 2011, 10:00 am </td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>Friday, April 22, 2011, 2:00 pm</td>
</tr>
<tr>
<td>Proposals Due</td>
<td>Friday, May 6, 2011, 2:00 pm</td>
</tr>
<tr>
<td>Contract Recommended for Award</td>
<td>June TJPA Board meeting</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Proposals to ensure receipt of all addenda, and to ensure their proposals respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-logistics-site-maintenance/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Logistics Traffic Control</title>
		<link>http://transbaycenter.org/rfp/traffic-control</link>
		<comments>http://transbaycenter.org/rfp/traffic-control#comments</comments>
		<pubDate>Fri, 10 Jun 2011 05:00:06 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5253</guid>
		<description><![CDATA[Request for Proposals for Traffic Control Services
Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for package TG05.4R &#8211; Traffic Control Services &#8211; from licensed Traffic or Civil Engineers for the Transbay Transit Center (TTC) Project located in San Francisco, California.  This is a re-issuance of RFP TG05.4.  Proposers [...]]]></description>
			<content:encoded><![CDATA[<h1><span id="MainContentBlock"><strong>Request for Proposals for Traffic Control Services</strong></span></h1>
<p>Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for package TG05.4R &#8211; Traffic Control Services &#8211; from licensed Traffic or Civil Engineers for the Transbay Transit Center (TTC) Project located in San Francisco, California.  This is a re-issuance of RFP TG05.4.  Proposers who submitted a proposal in response to TG05.4 must re-submit a proposal if they wish to be considered for evaluation.</p>
<p>Trade Subcontractors shall possess a valid and current State of California Professional Engineer License (Civil or Traffic Engineer) and/or Professional Registration with a C31 California License for the work for which it intends to submit a proposal and must provide proof of insurance in order to be eligible for submitting a proposal.</p>
<p>Trade Subcontractors are required to be certified Small Business Enterprises (SBEs) in order to propose for this scope of work.  Information on the TJPA SBE Program is available <a title="Doing Business with the TJPA" href="http://transbaycenter.org/tjpa/doing-business-with-the-tjpa">here</a>. </p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA); ARRA requirements include submitting monthly reports of hours/jobs.</p>
<p>An optional pre-proposal conference for Trade Subcontractors interested in submitting proposals was held on Thursday, April 14, 2010 at<br />
10:00 am, at the TJPA offices, 201 Mission Street, Suite 2100, San Francisco, CA.  The pre-proposal conference was optional but attendance was encouraged. <a href="http://transbaycenter.org/uploads/2011/06/TG05-4R-Traffic-Control-Pre-Bid-Presentation.pdf">Pre-Proposal Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/06/TG05_4R_SignIn_Sheets.pdf">Pre-Proposal Sign-in Sheets</a></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/Editable_QPD_Form.doc">Editable QPD Form</a></td>
<td>52KB .pdf</td>
<td>4/19/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_4R_Cover_Letter.pdf">Cover Letter</a></td>
<td>84KB .pdf</td>
<td>4/6/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_4R_Exhibit_A_RFP.pdf">RFP TG05.4R</a></td>
<td>456KB .pdf</td>
<td>4/6/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_4R_Exhibits_B_through_I_including_Long_Form_Subcontract.pdf">Exhibits B through I</a> (includes Long Form Subcontract)</td>
<td>1743KB .pdf</td>
<td>4/6/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_4R_Specifications.pdf">Specifications</a></td>
<td>4740KB .pdf</td>
<td>4/6/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_4R_RFP_Manual_Rev-10.pdf">Request for Proposals Manual (Rev 10)</a></td>
<td>449KB .pdf</td>
<td>4/6/11</td>
<td> </td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05_4R_Advertisement.pdf">Advertisement</a></td>
<td>35KB .doc</td>
<td>4/6/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/03/TG05-4_QA.pdf">Previous Q &amp; A regarding Traffic Control Professional Services</a></td>
<td>10KB .pdf</td>
<td>2/16/11</td>
</tr>
</tbody>
</table>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFP Dates</strong></td>
</tr>
<tr>
<td>RFP Issued</td>
<td>Wednesday, April 6, 2011</td>
</tr>
<tr>
<td>Optional Pre-Proposal Conference</td>
<td>Thursday, April 14, 2011, 10:00 am </td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>Wednesday, April 20, 2011, 2:00 pm</td>
</tr>
<tr>
<td>Proposals Due</td>
<td>Wednesday, May 4, 2011, 2:00 pm</td>
</tr>
<tr>
<td>Contract Recommended for Award</td>
<td>June TJPA Board meeting</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Proposals to ensure receipt of all addenda, and to ensure their proposals respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/traffic-control/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Utility Relocation (Mission St. AWSS)</title>
		<link>http://transbaycenter.org/rfp/site-utility-relocation-awss</link>
		<comments>http://transbaycenter.org/rfp/site-utility-relocation-awss#comments</comments>
		<pubDate>Fri, 10 Jun 2011 03:35:27 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5223</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG04.2 (Re-bid)


Bid Title:
Mission Street AWSS


Bid Due Date:
May 12, 2011 (formerly April 7)


Time Due:
2:00 pm


Engineers Estimate:
in excess of $6 million


SBE Requirement:
100%



Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Re-Bid from Trade Subcontractors for package TG04.2 &#8211; Mission Street AWSS &#8211; on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG04.2 (Re-bid)</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Mission Street AWSS</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td>May 12, 2011 (formerly April 7)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>2:00 pm</td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>in excess of $6 million</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>100%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Re-Bid from Trade Subcontractors for package TG04.2 &#8211; Mission Street AWSS &#8211; on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should have significant experience with Auxiliary Water Supply System demolition and construction.</p>
<p>Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on January 19, 2011 at 10:00 am.  The pre-bid conference was optional but attendance was highly encouraged, and staff was on hand to walk through the drawings.  <a href="http://transbaycenter.org/uploads/2011/03/TG04_2R_RUP_Pre-bid_Presentation_FINAL.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/03/TG04_2R_Pre-bid_Signins.pdf">Pre-Bid Sign-in Sheets</a> <br />
A second pre-bid Q &amp; A for Trade Subcontractors interested in submitting bids was held on May 5, 2011 at 2:00 pm. The pre-bid Q &amp; A was optional, and staff was on hand to walk through the drawings.  <a href="http://transbaycenter.org/uploads/2011/05/TG04_2R_RUP_Pre-bid_Presentation_5_5_2011_FINAL.pdf">Pre-Bid Q &amp; A Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/05/TG04_2R_Pre-bid_QandA_Signins5_5_2011.pdf">Pre-Bid Q &amp; A Sign-in Sheets</a></p>
<p>Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for utility relocation are:</p>
<ul>
<li>Synergy Project Management</li>
<li>Trinet Construction</li>
<li>M. Hernandez Construction</li>
<li>J. Flores Construction</li>
<li>P&amp;J Utility</li>
<li>Shaw Pipeline</li>
<li>Pacific Underground</li>
<li>Con-Quest Construction</li>
<li>Cal-State Constructors</li>
<li>M Squared Construction</li>
<li>Precision Engineering, Inc.</li>
<li>A Ruiz Construction</li>
<li>AZUL Works</li>
<li>D.W. Young Construction</li>
</ul>
<p>In addition to the Webcor/Obayashi qualification, all bidders must be in compliance with SFDPW BOE specifications and regulations regarding experience of individuals and firms doing work on the AWSS system. These qualifications are included in section 02723 (Part 3) of the BOE specifications.</p>
<p>Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than January 21, 2011. Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.</p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.</p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 14</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/06/TG04-2R_Bid_Tabulation.pdf">Bid Tabulation</a></td>
<td>35KB .pdf</td>
<td>Posted 5/16/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04_2R_Add3_Cover.pdf">Addendum #3 Cover Letter</a> (revised plans and specifications available via Ford Graphics;<br />
documents noted below as Rev C are from Addendum 3)</td>
<td>91KB .pdf</td>
<td>Posted 4/29/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04_2R_Add2_Cover.pdf">Addendum #2 Cover Letter</a> (documents noted below as Rev B are from Addendum 2)</td>
<td>91KB .pdf</td>
<td>Posted 4/1/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/03/TG04-2R_Add1_Cover.pdf">Addendum #1 Cover Letter</a> (revised plans available via Ford Graphics;<br />
documents noted below as Rev A are from Addendum 1)</td>
<td>87KB .pdf</td>
<td>Posted 2/4/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-2R_Cover.pdf">Invitation for Bid Cover Letter</a></td>
<td>61KB .pdf</td>
<td>Posted 1/10/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04_2-Add3_PBM_Re10.pdf">Project Bidding Manual</a> (Rev C) (Revision 10)</td>
<td>240KB .pdf</td>
<td>Posted 4/29/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04-2R_Add3_ExhibitA.pdf">Exhibit A</a> (Rev C)</td>
<td>8719KB .pdf</td>
<td>Posted 4/29/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04-2R_Add3_LFSC_and_ExhibitsB-I.pdf">Subcontract and Exhibits B-I</a> (Rev C)</td>
<td>2662KB .pdf</td>
<td>Posted 4/29/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04-2R_Add3_ExhibitsJ-L.pdf">Exhibits J-L</a> (Rev C) (CQC plan; SWPP plan; Hazmat Plan)</td>
<td>2662KB .pdf</td>
<td>Posted 4/29/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG04-2R_Plan_Holders_03_21_2011.pdf">Plan Holders List</a></td>
<td>30KB .pdf</td>
<td>Posted 3/21/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 1/10/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-2R_Adver.pdf">Advertisement</a></td>
<td>15KB .pdf</td>
<td>Posted 1/10/11</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/Utility_Relocation_RFQ_wi_bid.pdf">Request for Qualifications</a></td>
<td>145KB .pdf</td>
<td>Posted 1/10/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG04_RFQ_QNA_Combined.pdf">Previous Q&amp;A regarding Utility Relocation RFQ</a></td>
<td>26KB .pdf</td>
<td>Posted 1/10/11</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-utility-relocation-awss/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Real Estate Economics Bench</title>
		<link>http://transbaycenter.org/rfp/reecon</link>
		<comments>http://transbaycenter.org/rfp/reecon#comments</comments>
		<pubDate>Fri, 13 May 2011 05:56:40 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=6075</guid>
		<description><![CDATA[Request for Proposals for Real Estate Economics Advisory Services
The Transbay Joint Powers Authority (TJPA) is issuing a Request for Qualifications (RFQ) for REAL ESTATE ECONOMICS CONSULTING SERVICES (Services) for the Transbay Transit Center Program (Program) from firms or individuals (Respondents) with expertise in real estate valuation, real estate market research and analysis, tax increment projections, public-private real estate [...]]]></description>
			<content:encoded><![CDATA[<h1><span id="MainContentBlock"><strong>Request for Proposals for Real Estate Economics Advisory Services</strong></span></h1>
<p>The Transbay Joint Powers Authority (TJPA) is issuing a Request for Qualifications (RFQ) for REAL ESTATE ECONOMICS CONSULTING SERVICES (Services) for the Transbay Transit Center Program (Program) from firms or individuals (Respondents) with expertise in real estate valuation, real estate market research and analysis, tax increment projections, public-private real estate transactions, and developer agreements. The TJPA will establish a panel of qualified Respondents to provide a variety of real estate economics and evaluation services on an on-going as-needed basis over a five year period. </p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/Real_Estate_Bench_QA.pdf">Question/Answer on RFQ Document</a></td>
<td>16KB .pdf</td>
<td>Posted 4/15/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/REECON_RFQ_2011.pdf">Real Estate Economics RFQ</a></td>
<td>420KB .pdf</td>
<td>3/30/2011</td>
</tr>
<tr>
<td>Attachment 3:  <a href="http://transbaycenter.org/uploads/2011/05/Hourly-Rate-Fee-Proposal-Form.doc">Rate Proposal Form</a></td>
<td>76KB .doc</td>
<td>3/30/2011</td>
</tr>
<tr>
<td>Attachment 5:  <a href="http://transbaycenter.org/uploads/2010/11/DBE-SBE-RFP-Contract-Forms-CURRENT.xls">DBE-SBE Forms</a></td>
<td>83KB .xls</td>
<td>3/30/2011</td>
</tr>
</tbody>
</table>
<p><span id="MainContentBlock">The TJPA is prepared to select a bench of Respondents to perform the services on an as-needed basis for a term of five years.</span></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFP Dates</strong></td>
</tr>
<tr>
<td>RFP Issued</td>
<td>Wednesday, March 30, 2011</td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>Friday, April 8, 2011, 5:00 pm</td>
</tr>
<tr>
<td>Responses to Written Questions Posted</td>
<td>Wednesday, April 13, 2011</td>
</tr>
<tr>
<td>Proposals Due</td>
<td>Wednesday, April 20, 2011, 2:00 pm</td>
</tr>
<tr>
<td>Interviews</td>
<td>Wednesday, April 27, 2011</td>
</tr>
<tr>
<td>Contract Recommended for Award</td>
<td>Thursday, May 12, 2011</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/reecon/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Logistics Temporary Power</title>
		<link>http://transbaycenter.org/rfp/site-logistics-temporary-power</link>
		<comments>http://transbaycenter.org/rfp/site-logistics-temporary-power#comments</comments>
		<pubDate>Fri, 13 May 2011 03:53:46 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5239</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG05.2R


Bid Title:
Site Logistics Temporary Power (Re-bid)


Bid Due Date:
April 21, 2011


Time Due:
2:00 pm


Engineers Estimate:
$600,000


SBE Requirement:
100%



Description:
Webcor/Obayashi Joint Venture seeks Trade Subcontractors with significant experience in installation of temporary power skids and associated infrastructure with metering switchgear per PG&#38;E standards on complex projects which present significant coordination with adjacent properties and traffic relocation; located in an [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG05.2R</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Site Logistics Temporary Power (Re-bid)</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td>April 21, 2011</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>2:00 pm</td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>$600,000</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>100%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks Trade Subcontractors with significant experience in installation of temporary power skids and associated infrastructure with metering switchgear per PG&amp;E standards on complex projects which present significant coordination with adjacent properties and traffic relocation; located in an urban environment including the engineering, coordination, procurement and complete installation of respective systems. The work to be performed includes but is not limited to the following:</p>
<ul>
<li>engineer, design, coordinate and install five temporary power skids and metered switchgear per PG&amp;E standards in preparation of transformer and line power connection</li>
<li>install on and offsite ground ducts, distribution panel with above grade conduit stub-outs for future connection by other subcontractors</li>
<li>provide and install protective bollards and fencing at each skid</li>
<li>provide assistance with power hookup at distribution panels for future site subcontractor</li>
<li>conduct scheduled maintenance for gear and panels as needed over 1.5 year period</li>
<li>abandon all gear, materials and installations upon conclusion of scheduled maintenance</li>
</ul>
<p>Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on March 10, 2011 at TJPA offices.  Attendance was optional for Bidders.  A copy of the presentation is below. </p>
<p>Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for Site Logistics Temporary Power are:</p>
<ul>
<li>Sierra Electric</li>
<li>Reliance Engineering, Inc.</li>
<li>Phoenix Electric</li>
<li>Bass Electric</li>
<li>Liberty Electric of San Mateo, Inc.</li>
</ul>
<p>Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than March 25, 2011.  Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.</p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.</p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 12</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG05-2R_TempPower_Bid_Tabulation.pdf">Bid Tabulation</a></td>
<td>23KB .pdf</td>
<td>Posted 4/25/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG05-2R_QA.pdf">Question/Answer on Bid Documents</a></td>
<td>448KB .pdf</td>
<td>Posted 4/13/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG05-2R_Pre-Bid_Presentation.pdf">Pre-Bid Meeting Presentation</a></td>
<td>479KB .pdf</td>
<td>Posted 3/10/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG05.2R_Pre-Bid_Signins.pdf">Pre-Bid Meeting Sign-in Sheet</a></td>
<td>337KB .pdf</td>
<td>Posted 3/10/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05.2R_IFB_Cover_Letter.pdf">Invitation for Bid Cover Letter</a></td>
<td>57KB .pdf</td>
<td>Posted 3/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05-2R_Project_Bidding_Manual.pdf">Project Bidding Manual</a></td>
<td>348KB .pdf</td>
<td>Posted 3/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05.2R_Long_Form_Subcontract_R1_Exh_B-I.pdf">Long Form Subcontract and Exhibits B through I</a></td>
<td>2482KB .pdf</td>
<td>Posted 3/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05-2R_ExhibitA.pdf">Exhibit A</a></td>
<td>1195KB .pdf</td>
<td>Posted 3/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/05/TG05-2R_Plan_Holders_03_21_2011.pdf">Plan Holders List</a></td>
<td>21KB .pdf</td>
<td>Posted 3/21/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 3/3/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/04/TG05-2R_Advertisement.pdf">Advertisement</a></td>
<td>26KB .pdf</td>
<td>Posted 3/3/11</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG05-2_RFQ1.pdf">Request for Qualifications</a></td>
<td>25KB .pdf</td>
<td>Posted 12/9/10</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-logistics-temporary-power/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Logistics Survey &amp; Control</title>
		<link>http://transbaycenter.org/rfp/site-logistics-survey-control</link>
		<comments>http://transbaycenter.org/rfp/site-logistics-survey-control#comments</comments>
		<pubDate>Fri, 11 Mar 2011 03:51:26 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5237</guid>
		<description><![CDATA[Request for Proposals for Survey &#38; Control Services
Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors for on-call General Survey &#38; Control Services with expertise in general surveying, benchmark and grid control services in an urban environment on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California.
Trade Subcontractors are [...]]]></description>
			<content:encoded><![CDATA[<h1><span id="MainContentBlock"><strong>Request for Proposals for Survey &amp; Control Services</strong></span></h1>
<p>Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors for on-call General Survey &amp; Control Services with expertise in general surveying, benchmark and grid control services in an urban environment on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California.</p>
<p>Trade Subcontractors are required to be certified Small Business Enterprises (SBEs).  Information on the TJPA SBE Program is available <a title="Doing Business with the TJPA" href="http://transbaycenter.org/tjpa/doing-business-with-the-tjpa">here</a>. </p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA); ARRA requirements include submitting monthly reports of hours/jobs.</p>
<p>A mandatory pre-proposal conference was held on December 2.  <a href="http://transbaycenter.org/uploads/2010/12/TG05-1_Survey_Control_Pre-proposal_presentation.pdf">Pre-Proposal Presentation</a> | <a href="http://transbaycenter.org/uploads/2010/12/TG05-1_Survey_Control_Pre-proposal_Signins.pdf">Pre-Proposal Sign-in Sheets</a></p>
<p><em>*The Request for Proposals Manual, which includes general instructions to proposers, is now posted below. (as of December 16, 2010)  </em></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="3"><strong>Download Documents </strong><strong>(Note: Don&#8217;t forget to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">Register</a> to be alerted when changes and new documents are added)</strong></td>
</tr>
<tr>
<td width="75%"><strong>Document (Click to Download)</strong></td>
<td><strong>File Size &amp; Type</strong></td>
<td><strong>Date Posted</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/Addn_1_TG05-1_Cover_Letter.pdf">Addendum No. 1 Cover Letter</a> (documents noted below as Rev A are from Addendum 1)</td>
<td>92KB .pdf</td>
<td>Posted 12/16/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG05-1_Cover.pdf">Cover Letter</a></td>
<td>84KB .pdf</td>
<td>11/19/2010</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/Addn_1_TG05-1_ExhibitA.pdf">RFP TG05.1 (Exhibit A)</a> (Rev A)</td>
<td>213KB .pdf</td>
<td>12/16/2010</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG05-1_Contract_ExhibitsC-I.pdf">Exhibits B through I</a> (includes Long Form Subcontract)</td>
<td>2547KB .pdf</td>
<td>11/19/2010</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG05-1_Specifications-Volume-1.pdf">Specifications</a></td>
<td>4959KB .pdf</td>
<td>11/19/2010</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/Addn_1_REV_-8_TG05-1_RFP_Manual.pdf">Request for Proposals Manual</a> (Rev A)</td>
<td>352KB .pdf</td>
<td>12/16/2010</td>
<td> </td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG05-1_Advertisement.pdf">Advertisement</a></td>
<td>13KB .doc</td>
<td>11/19/2010</td>
</tr>
</tbody>
</table>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Key RFP Dates</strong></td>
</tr>
<tr>
<td>RFP Issued</td>
<td>Thursday, November 18, 2010</td>
</tr>
<tr>
<td>Optional Pre-Proposal Conference</td>
<td>Thursday, December 2, 2010, 10:00 am </td>
</tr>
<tr>
<td>Deadline for Submission of Questions</td>
<td>Friday, December 17, 2010, 2:00 pm</td>
</tr>
<tr>
<td>Proposals Due</td>
<td>Monday, January 17, 2011, 2:00 pm</td>
</tr>
<tr>
<td>Contract Recommended for Award</td>
<td>Thursday, March 10, 2011</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-logistics-survey-control/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Utility Relocation (Beale St. Sewer)</title>
		<link>http://transbaycenter.org/rfp/site-utility-relocation-beale-st-sewer</link>
		<comments>http://transbaycenter.org/rfp/site-utility-relocation-beale-st-sewer#comments</comments>
		<pubDate>Fri, 11 Feb 2011 03:41:35 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5230</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG04.6


Bid Title:
Beale/Main/Howard/Mission Street Sewer &#38; Sludge


Bid Due Date:
January 14, 2011 (formerly January 7)


Time Due:
10:00 am


Engineers Estimate:
$1.7 million


SBE Requirement:
100%



Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.6 &#8211; Beale, Main, Howard, Mission Streets Sewer &#38; Sludge - on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG04.6</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Beale/Main/Howard/Mission Street Sewer &amp; Sludge</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td>January 14, 2011 (formerly January 7)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>10:00 am</td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>$1.7 million</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>100%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.6 &#8211; Beale, Main, Howard, Mission Streets Sewer &amp; Sludge - on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should have significant experience with underground sewer work.</p>
<p>Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on December 16, 2010 at 10:00 am, at TJPA offices, 201 Mission Street, Suite 2100, San Francisco, CA.  The pre-bid conference was optional but attendance was highly encouraged. <a href="http://transbaycenter.org/uploads/2011/02/TG04-6_pre-bid_presentation.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/02/TG04-6_Pre-Bid_Signins.pdf">Pre-Bid Sign-in Sheets</a></p>
<p>An additional pre-bid conference/drawing review for Trade Subcontractors interested in submitting bids was held on January 10, 2011 at 1:00 pm, at TJPA offices, 01 Mission Street, Suite 2100, San Francisco, CA. The pre-bid conference/drawing review was optional but attendance was encouraged. <a href="http://transbaycenter.org/uploads/2011/02/TG04-6_Pre-Bid_Drawing_Review_Signins_01_10_2011.pdf">Pre-Bid Conference/Drawing Review Sign-in Sheets</a></p>
<p>Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for this package are:</p>
<ul>
<li>Synergy Project Management</li>
<li>Trinet Construction</li>
<li>M. Hernandez Construction</li>
<li>J. Flores Construction</li>
<li>P&amp;J Utility</li>
<li>Shaw Pipeline</li>
<li>Pacific Underground</li>
<li>Con-Quest Construction</li>
<li>Cal-State Constructors</li>
<li>M Squared Construction</li>
<li>Precision Engineering, Inc.</li>
<li>A. Ruiz Construction (added 1/5/11)</li>
<li>AZUL Works (added 1/13/11)</li>
</ul>
<p>Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than 10 business days prior to the Bid Due Date. Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.</p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.</p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 11</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/Bid_Tabulation_TG04-6.pdf">Bid Tabulation</a></td>
<td>31KB .pdf</td>
<td>Posted 1/19/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG04-6_Add1_Cover.pdf">Addendum No. 1 Cover Letter</a> (revised plans/specs available from Ford Graphics;<br />
documents noted below as Rev A are from Addendum No. 1)</td>
<td>86KB .pdf</td>
<td>Posted 1/5/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-6_Cover.pdf">Invitation for Bid Cover Letter</a></td>
<td>54KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-6_PBM.pdf">Project Bidding Manual</a></td>
<td>209KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG04-6_Add1_ExhibitA.pdf">Exhibit A</a> (Rev A)</td>
<td>8930KB .pdf</td>
<td>Posted 1/5/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-6_Contract_Ex_B-I.pdf">Subcontract and Exhibits B through I</a></td>
<td>2968KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG04-6_Plan_Holders_01_10_2011.pdf">Plan Holders List</a></td>
<td>124KB .pdf</td>
<td>Posted 1/10/11</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/02/TG04-6_Advertisement.pdf">Advertisement</a></td>
<td>15KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/Utility_Relocation_RFQ_wi_bid.pdf">Request for Qualifications</a></td>
<td>145KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG04_RFQ_QNA_Combined.pdf">Previous Q&amp;A regarding Utility Relocation RFQ</a></td>
<td>26KB .pdf</td>
<td>Posted 12/7/10</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-utility-relocation-beale-st-sewer/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Utility Relocation (Natoma/Fremont Water/Sewer)</title>
		<link>http://transbaycenter.org/rfp/site-utility-relocation-natomafremont-watersewer</link>
		<comments>http://transbaycenter.org/rfp/site-utility-relocation-natomafremont-watersewer#comments</comments>
		<pubDate>Fri, 14 Jan 2011 03:30:47 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5221</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG04.1


Bid Title:
Natoma &#38; Fremont Streets Water &#38; Sewer


Bid Due Date:
December 10, 2010 ( formerly December 8 )


Time Due:
10:00 am


Engineers Estimate:
$2.3 million


SBE Requirement:
100%



Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.1 &#8211; Natoma &#38; Fremont Streets Water and Sewer &#8211; on the Transbay Transit Center project in San Francisco, [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG04.1</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Natoma &amp; Fremont Streets Water &amp; Sewer</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td>December 10, 2010 ( formerly December 8 )</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>10:00 am</td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>$2.3 million</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>100%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.1 &#8211; Natoma &amp; Fremont Streets Water and Sewer &#8211; on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should have significant experience with underground domestic water and underground sewer.</p>
<p>Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on November 18, 2010.  The pre-bid conference was optional but attendance was highly encouraged. <a href="http://transbaycenter.org/uploads/2011/01/TG04-1_4-2_pre-bid_presentation1.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2011/01/TG04-1_4-2_Pre-Bid_Signins1.pdf">Pre-Bid Sign-in Sheets</a></p>
<p>A bid document review session was held on Friday, December 3.  Representatives from AECOM, Webcor/Obayashi, and TJPA were available to walk-through the drawings and answer questions.  Attendance was not mandatory for prospective bidders.  <a href="http://transbaycenter.org/uploads/2011/01/TG04-1_4-2_Bid_Document_Review_Signins.pdf">Bid Document Review Sign-in Sheets</a><strong><em> </em></strong></p>
<p>Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for this package are:</p>
<ul>
<li>Synergy Project Management</li>
<li>Trinet Construction</li>
<li>M. Hernandez Construction</li>
<li>J. Flores Construction</li>
<li>P&amp;J Utility</li>
<li>Shaw Pipeline</li>
<li>Pacific Underground</li>
<li>Con-Quest Construction</li>
<li>Cal-State Constructors</li>
<li>M Squared Construction</li>
<li>Precision Engineering, Inc.</li>
</ul>
<p>Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than 10 business days prior to the Bid Due Date. Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.</p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.</p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 11</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-1_Addendum_01_Cover.pdf">Addendum No. 1 Cover Letter</a> (revised plans/specs available via Ford Graphics;<br />
documents noted below as Rev A are from Addendum 1)</td>
<td>86KB .pdf</td>
<td>Posted 12/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-1_Cover.pdf">Invitation for Bid Cover Letter</a></td>
<td>54KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-1_ProjectBiddingManual.pdf">Project Bidding Manual</a></td>
<td>198KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-1_Addendum_01_ExhibitA.pdf">Exhibit A</a> (Rev A)</td>
<td>8,796KB .pdf</td>
<td>Posted 12/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-1_LongFormSubcontract.pdf">Subcontract</a></td>
<td>118KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-1_ExhibitB_I.pdf">Exhibits B through I</a></td>
<td>2,712KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2011/01/TG04-1_Plan_Holders_11-15-2010.pdf">Plan Holders List</a></td>
<td>9KB .pdf </td>
<td>Posted 11/15/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-1_Advertisement.pdf">Advertisement</a></td>
<td>27KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/Utility_Relocation_RFQ_wi_bid.pdf">Request for Qualifications</a></td>
<td>145KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG04_RFQ_QNA_Combined.pdf">Previous Q&amp;A regarding Utility Relocation RFQ</a></td>
<td>26KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-utility-relocation-natomafremont-watersewer/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Utility Relocation (Natoma Water/Sewer)</title>
		<link>http://transbaycenter.org/rfp/site-utility-relocation-natoma-watersewer</link>
		<comments>http://transbaycenter.org/rfp/site-utility-relocation-natoma-watersewer#comments</comments>
		<pubDate>Fri, 10 Dec 2010 03:40:27 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5228</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG04.4


Bid Title:
Natoma &#38; First Streets Demolition, Water &#38; Sewer


Bid Due Date:
November 12, 2010 (formerly November 9)


Time Due:
10:00 am


Engineers Estimate:
$2.5 million


SBE Requirement:
100%



Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.4 &#8211; Natoma &#38; First Streets Demolition, Water and Sewer - on the Transbay Transit Center project in San Francisco, California. [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG04.4</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Natoma &amp; First Streets Demolition, Water &amp; Sewer</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td><strong>November 12, 2010 </strong>(formerly November 9)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td><strong>10:00 am</strong></td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>$2.5 million</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>100%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.4 &#8211; Natoma &amp; First Streets Demolition, Water and Sewer - on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should have significant experience with underground domestic water and underground sewer.</p>
<p>Starting October 13, 2010, Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on October 27, 2010. The pre-bid conference was mandatory for Bidders. It was optional for subcontractors to Bidders. <a href="http://transbaycenter.org/uploads/2010/12/TG04-3_04-4_Pre-Bid_Presentation.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2010/12/TG04-3_4-4_Pre-Bid_Signins.pdf">Pre-Bid Sign-in Sheets</a></p>
<p>Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for this package are:</p>
<ul>
<li>Synergy Project Management</li>
<li>Trinet Construction</li>
<li>M. Hernandez Construction</li>
<li>J. Flores Construction</li>
<li>P&amp;J Utility</li>
<li>Shaw Pipeline</li>
<li>Pacific Underground</li>
<li>Con-Quest Construction</li>
<li>Cal-State Constructors</li>
<li>M Squared Construction (added 11/8/10)</li>
<li>Precision Engineering, Inc. (added 11/8/10)</li>
</ul>
<p>Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than 10 business days prior to the Bid Due Date. Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.</p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.</p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 15</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Bid_Tabulation.pdf">Bid Tabulation</a></td>
<td>17KB .pdf</td>
<td>Posted 11/22/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_IFB_QA.pdf">Questions &amp; Answers</a></td>
<td>505KB .pdf</td>
<td>Posted 11/5/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Addendum_03_Cover.pdf">Addendum No. 3 Cover Letter</a> (revised specs available from Ford Graphics;<br />
documents noted below as Rev C are from Addendum No. 3</td>
<td>88KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Addendum_02_Cover.pdf">Addendum No. 2 Cover Letter</a> (revised plans/specs available from Ford Graphics;<br />
documents noted below as Rev B are from Addendum No. 2</td>
<td>52KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Addend1_Cover.pdf">Addendum No. 1 Cover Letter</a> (revised qualification due date;<br />
documents noted below as Rev A are from Addendum No. 1</td>
<td>52KB .pdf</td>
<td>Posted 10/28/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_IFBCoverLetter.pdf">Invitation for Bid Cover Letter</a></td>
<td>54KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Addendum_02_-Project-Bidding-Manual.pdf">Project Bidding Manual</a> (Rev B)</td>
<td>226KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Addendum_03_ExhibitA_RevC.pdf">Exhibit A</a> (Rev C &#8211; Revised Bid Form <em>only</em>)</td>
<td>198KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04_4_Addendum_02_ExhibitA.pdf">Exhibit A</a> (Rev B)</td>
<td>240KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Addend02_SubcontractExhB-I.pdf">Subcontract and Exhibits B through I</a> (Rev B)</td>
<td>2822KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Plan_Holder_List_11-1-10.pdf">Plan Holders List</a></td>
<td>9KB .pdf</td>
<td>Posted 10/21/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-4_Advertisement.pdf">Advertisement</a></td>
<td>13KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/Utility_Relocation_RFQ_wi_bid.pdf">Request for Qualifications</a></td>
<td>145KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG04_RFQ_QNA_Combined.pdf">Previous Q&amp;A regarding Utility Relocation RFQ</a></td>
<td>26KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/site-utility-relocation-natoma-watersewer/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Site Utility Relocation (Howard St. Water)</title>
		<link>http://transbaycenter.org/rfp/wet-utility-relocation</link>
		<comments>http://transbaycenter.org/rfp/wet-utility-relocation#comments</comments>
		<pubDate>Fri, 10 Dec 2010 03:39:12 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=5226</guid>
		<description><![CDATA[


Bid Type:
Construction


Bid Number:
TG04.3


Bid Title:
Howard, Beale &#38; First Streets Water


Bid Due Date:
November 12, 2010 (formerly November 9)


Time Due:
10:00 am


Engineers Estimate:
$1.6 million


SBE Requirement:
100%



Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.3 &#8211; Howard, Beale &#38; First Streets Water &#8211; on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>TG04.3</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>Howard, Beale &amp; First Streets Water</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td><strong>November 12, 2010 </strong>(formerly November 9)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td><strong>10:00 am</strong></td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>$1.6 million</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>100%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.3 &#8211; Howard, Beale &amp; First Streets Water &#8211; on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should have significant experience with underground domestic water.</p>
<p>Starting October 13, 2010, Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com/" target="_blank">PlanWell</a>, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.</p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on October 27, 2010.  The pre-bid conference was mandatory for Bidders. It was optional for subcontractors to Bidders.  <a href="http://transbaycenter.org/uploads/2010/12/TG04-3_04-4_Pre-Bid_Presentation.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2010/12/TG04-3_4-4_Pre-Bid_Signins.pdf">Pre-Bid Sign-in Sheets</a></p>
<p>Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for this package are:</p>
<ul>
<li>Synergy Project Management</li>
<li>Trinet Construction</li>
<li>M. Hernandez Construction</li>
<li>J. Flores Construction</li>
<li>P&amp;J Utility</li>
<li>Shaw Pipeline</li>
<li>Pacific Underground</li>
<li>Con-Quest Construction</li>
<li>Cal-State Constructors</li>
<li>M Squared Construction (added 11/8/10)</li>
<li>Precision Engineering, Inc. (added 11/8/10)</li>
</ul>
<p>Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than 10 business days prior to the Bid Due Date. Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.</p>
<p>Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.</p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 15</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Bid_Tabulation.pdf">Bid Tabulation</a></td>
<td>17KB .pdf</td>
<td>Posted 11/22/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_IFB_QA.pdf">Questions &amp; Answers</a></td>
<td>506KB .pdf</td>
<td>Posted 11/5/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addendum_03_Cover.pdf">Addendum No. 3 Cover Letter</a> (revised specs available from Ford Graphics;<br />
documents noted below as Rev C are from Addendum No. 3)</td>
<td>89KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addendum_02_Cover.pdf">Addendum No. 2 Cover Letter</a> (revised plans/specs available from Ford Graphics;<br />
documents noted below as Rev B are from Addendum No. 2)</td>
<td>52KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addend1_Cover.pdf">Addendum No. 1 Cover Letter</a> (revises qualification due date;<br />
documents noted below as Rev A are from Addendum No. 1)</td>
<td>52KB .pdf</td>
<td>Posted 10/28/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_IFBCoverLetter.pdf">Invitation for Bid Cover Letter</a></td>
<td>54KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addendum_02_Project-Bidding-Manual.pdf">Project Bidding Manual</a></td>
<td>226KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addendum_03_ExhibitA_RevC.pdf">Exhibit A</a> (Rev C &#8211; Revised Bid Form <em>only</em>)</td>
<td>189KB .pdf</td>
<td>Posted 11/9/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addendum_02_ExhibitA.pdf">Exhibit A</a> (Rev B)</td>
<td>322KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Addend2_Subcontract_ExhB-I.pdf">Subcontract and Exhibits B through I</a> (Rev B)</td>
<td>2822KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Plan_Holder_List_11-1-10.pdf">Plan Holders List</a></td>
<td>9KB .pdf</td>
<td>Posted 11/1/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG04-3_Advertisement.pdf">Advertisement</a></td>
<td>11KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/Utility_Relocation_RFQ_wi_bid.pdf">Request for Qualifications</a></td>
<td>145KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG04_RFQ_QNA_Combined.pdf">Previous Q&amp;A regarding Utility Relocation RFQ</a></td>
<td>26KB .pdf</td>
<td>Posted 10/13/10</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/wet-utility-relocation/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Buttress/Shoring/Excavation (BSE)</title>
		<link>http://transbaycenter.org/rfp/shoring-buttress-excavation</link>
		<comments>http://transbaycenter.org/rfp/shoring-buttress-excavation#comments</comments>
		<pubDate>Fri, 10 Dec 2010 00:56:07 +0000</pubDate>
		<dc:creator>sgigliotti</dc:creator>
				<category><![CDATA[RFPs]]></category>

		<guid isPermaLink="false">http://transbaycenter.org/?p=3867</guid>
		<description><![CDATA[


Bid Type:
  Construction


Bid Number:
  TG03


Bid Title:
  Shoring, Buttress, Internal Bracing, Access Trestle, Temporary Bridge, Excavation, Demolition, Dewatering, Tie-Downs


Bid Due Date:
  November 9, 2010 (formerly October 12, 2010)


Time Due:
  2:00 p.m.


Engineers Estimate:
  $206,500,000


SBE Requirement:
  24%



Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG03 &#8211; Buttress, Shoring, Internal Bracing, Access Trestle, [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="85%">
<tbody>
<tr>
<td style="text-align: right;">Bid Type:</td>
<td>  Construction</td>
</tr>
<tr>
<td style="text-align: right;">Bid Number:</td>
<td>  TG03</td>
</tr>
<tr>
<td style="text-align: right;">Bid Title:</td>
<td>  Shoring, Buttress, Internal Bracing, Access Trestle, Temporary Bridge, Excavation, Demolition, Dewatering, Tie-Downs</td>
</tr>
<tr>
<td style="text-align: right;">Bid Due Date:</td>
<td>  November 9, 2010 (formerly October 12, 2010)</td>
</tr>
<tr>
<td style="text-align: right;">Time Due:</td>
<td>  2:00 p.m.</td>
</tr>
<tr>
<td style="text-align: right;">Engineers Estimate:</td>
<td>  $206,500,000</td>
</tr>
<tr>
<td style="text-align: right;">SBE Requirement:</td>
<td>  24%</td>
</tr>
</tbody>
</table>
<p>Description:<br />
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG03 &#8211; Buttress, Shoring, Internal Bracing, Access Trestle, Temporary Bridge, Excavation, Demolition, Dewatering, and Micro Piles &#8211; on the Transbay Transit Center project in San Francisco, California.  Trade Subcontractors should have significant experience with the following:</p>
<ul>
<li>deep drilled shafts</li>
<li>deep excavations with design-build internal bracing</li>
<li>complex projects in an urban environment with significant coordination with adjacent properties and traffic</li>
</ul>
<p>Starting July 30, 2010, Bid Plans and Specifications may be purchased via Ford Graphics <a href="http://www.fordsfoplanwell.com" target="_blank">PlanWell</a>, (415) 537-2200.  Other package documents, including the Project Bidding Manual, are posted below. </p>
<p>A pre-bid conference for Trade Subcontractors interested in submitting bids was held on August 19, 2010.  The pre-bid conference was mandatory for Bidders; optional for subcontractors to Bidders.  <a href="http://transbaycenter.org/uploads/2010/10/TG03_Pre-Bid_Presentation.pdf">Pre-Bid Presentation</a> | <a href="http://transbaycenter.org/uploads/2010/11/TG03_Pre-Bid_Signins.pdf">Pre-Bid Sign-In Sheets</a> | <a href="http://transbaycenter.org/uploads/2010/11/TG03_Pre-Bid_QNA.pdf">Pre-Bid Questions &amp; Answers</a></p>
<p>Bidders must be pre-qualified for this package.  Currently pre-qualified bidders are:</p>
<ul>
<li>Balfour Beatty Infrastructure, Inc.</li>
<li>Granite/CJA/NCC Joint Venture</li>
<li>Kiewit Pacific Co.</li>
<li>Shimmick/Skanska/Traylor, A Joint Venture</li>
<li>Tutor-Saliba Corporation</li>
</ul>
<p>Flatiron West, Inc., while pre-qualified, is conflicted out of bidding on Transbay Transit Center construction packages.  Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than 10 business days prior to the Bid Due Date.  Bids from unqualified bidders at the time of bid opening will be returned unopened.  Qualification application documents are posted below. </p>
<p><strong><em>The Bid Due Date has been extended to November 9, 2010.  Questions on Bid Documents will not be accepted after 2:00 pm on October 15, 2010.  </em></strong></p>
<table border="1" width="85%">
<tbody>
<tr>
<td colspan="2"><strong>Attached Files</strong></td>
<td style="text-align: right;">No. of Files: 33</td>
</tr>
<tr>
<td colspan="3">Click titles below to download</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_Bid_Tabulation.pdf">Bid Tabulation</a> (revised with Sub listing)</td>
<td>27KB .pdf</td>
<td>Posted 11/17/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_IFB_QNA_matrix.pdf">Matrix of Questions &amp; Answers</a><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_matrix.pdf"></a></td>
<td>29KB .pdf</td>
<td>Posted 10/28/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_IFB_QNA_10_Rev.pdf">Questions &amp; Answers #10</a> (revised posting changes Addendum reference in Q#355)</td>
<td>13.9MB .pdf</td>
<td>Posted 10/28/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_9.pdf">Questions &amp; Answers #9</a></td>
<td>536KB .pdf</td>
<td>Posted 10/15/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_8.pdf">Questions &amp; Answers #8</a></td>
<td>99KB .pdf</td>
<td>Posted 10/8/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_7.pdf">Questions &amp; Answers #7</a></td>
<td>517KB .pdf</td>
<td>Posted 10/5/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_6.pdf">Questions &amp; Answers #6</a></td>
<td>536KB .pdf</td>
<td>Posted 9/27/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_5.pdf">Questions &amp; Answers #5</a></td>
<td>592KB .pdf</td>
<td>Posted 9/20/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_4.pdf">Questions &amp; Answers #4</a></td>
<td>551KB .pdf</td>
<td>Posted 9/10/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_3.pdf">Questions &amp; Answers #3</a></td>
<td>536KB .pdf</td>
<td>Posted 9/8/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_2.pdf">Questions &amp; Answers #2</a> (revised posting includes referenced sketch)</td>
<td>107KB .pdf </td>
<td>Posted 8/31/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_1.pdf">Questions &amp; Answers #1</a><a href="http://transbaycenter.org/uploads/2010/11/TG03_IFB_QNA_1.pdf"></a></td>
<td>67KB .pdf</td>
<td>Posted 8/23/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_Addendum_07_Cover.pdf">Addendum No. 7 Cover Letter</a> (revised plans/specs available from Ford Graphics;<br />
documents noted below as RevG are from Addendum 7)</td>
<td>42KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_Addendum_06_Cover.pdf">Addendum No. 6 Cover Letter</a> (revised specs available from Ford Graphics;<br />
documents noted below as RevF are from Addendum 6)</td>
<td>41KB .pdf</td>
<td>Posted 11/1/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_Addendum_05_Cover.pdf">Addendum No. 5 Cover Letter</a> (revised plans/specs available from Ford Graphics;<br />
documents noted below as RevE are from Addendum 5)</td>
<td>41KB .pdf</td>
<td>Posted 11/1/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_Addendum_04_CoverSheet_Rev_0.pdf">Addendum No. 4 Cover Letter</a> (Revised Bid Date and Revised QBD Due Date)</td>
<td>30KB .pdf</td>
<td>Posted 10/11/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_Addendum_03_Cover.pdf">Addendum No. 3 Cover Letter</a> (revised plans/specs available from Ford Graphics;<br />
documents noted below as RevD are from Addendum 3)</td>
<td>41.2KB .pdf</td>
<td>Posted 9/27/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/TG03_Addendum_02_Rev0.pdf">Addendum No. 2 Cover Letter</a> (revised plans/specs available from Ford Graphics)</td>
<td>40.1KB .pdf</td>
<td>Posted 8/30/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG03_Addendum_01_Rev0_Cover.pdf">Addendum No. 1 Cover Letter</a> (revised plans/specs available from Ford Graphics)</td>
<td>39.7KB .pdf</td>
<td>Posted 8/17/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/01_TG03_BSE_IFB-Cover_Letter_Web.pdf">Invitation For Bid Cover Letter</a></td>
<td>53KB .pdf</td>
<td>Posted 7/30/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TTC_Project_Bidding_Manual_BSE_RevE_.pdf">Project Bidding Manual</a> (Rev E)</td>
<td>220KB .pdf</td>
<td>Posted 11/1/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_BSE_IFB_ExhibitA_Addend07.pdf">Exhibit A</a> (Rev G)</td>
<td>325KB .pdf</td>
<td>Posted 11/1/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_Addend07_Subcontract.pdf">Long Form Subcontract</a> (Rev G)</td>
<td>119KB .pdf</td>
<td>Posted 11/3/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_BSE_IFB_RevD_ExhibitsB-I.pdf">Exhibits B through I</a> (Rev D)</td>
<td>3,173KB .pdf</td>
<td>Posted 9/27/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/12/TG03_BSE_PlanHolders_11-1-10.pdf">Plan Holders List</a><a href="http://transbaycenter.org/uploads/2010/11/TG03_BSE_PlanHolders_9-20-10.pdf"></a></td>
<td>15KB .pdf</td>
<td>Posted 11/1/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/11/Plan_Room_List.pdf">Plan Room List</a></td>
<td>33KB .pdf</td>
<td>Posted 8/26/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/10/TG03_Advertisement_IFB_Final.pdf">Advertisement</a></td>
<td>21.2KB .pdf</td>
<td>Posted 7/23/10</td>
</tr>
<tr>
<td colspan="3"><strong>QUALIFICATION DOCUMENTS</strong></td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/04/TG03_RFQ_QNA_5.pdf">RFQ Questions 34-45 &amp; Answers</a></td>
<td>27KB .pdf</td>
<td>Posted 2/24/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/04/TG03_RFQ_QNA_4.pdf">RFQ Question 33 &amp; Answer</a></td>
<td>15KB .pdf</td>
<td>Posted 2/18/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/04/TG03_RFQ_QNA_3.pdf">RFQ Questions 27-32 &amp; Answers</a></td>
<td>20KB .pdf</td>
<td>Posted 2/17/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/04/TG03_RFQ_QNA_2.pdf">RFQ Questions 11-26 &amp; Answers</a></td>
<td>28KB .pdf</td>
<td>Posted 2/12/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/04/TG03_RFQ_QNA_1.pdf">RFQ Questions 1-10 &amp; Answers </a></td>
<td>23KB .pdf</td>
<td>Posted 2/11/10</td>
</tr>
<tr>
<td><a href="http://transbaycenter.org/uploads/2010/03/TG03_Shoring-Buttress_RFQ.pdf">Request for Qualifications TG03</a></td>
<td>155KB .pdf</td>
<td>Posted 2/2/10</td>
</tr>
</tbody>
</table>
<p>For notification of updates, contractors are encouraged to <a href="http://transbaycenter.org/receive-updates/receive-contract-information">register</a> on the TJPA&#8217;s website.  However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.</p>
]]></content:encoded>
			<wfw:commentRss>http://transbaycenter.org/rfp/shoring-buttress-excavation/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>